Power Reactor Status Report for September 20, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 94 | COASTDOWN TO REFUELING OUTAGE | |||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 98 | COASTDOWN TO REFUELING OUTAGE | |||
Peach Bottom 2 | 0 | 09/15/2006 | REFUELING OUTAGE | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 91 | FEEDWATER HEATER ISSUE | * | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 0 | 09/19/2006 | TRIP - SEE EN# 42848 | * | 1 |
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 0 | 09/16/2006 | REFUELING OUTAGE | ||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 0 | 09/16/2006 | REFUELING OUTAGE | ||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 0 | 09/10/2006 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 0 | 09/10/2006 | REFUELING OUTAGE - DEFUELED | ||
Byron 2 | 100 | ONE 345 KV LINE REMOVED FROM SERVICE - RESTORATION ANTICIPATED AT 1600 ON 9/22 | * | ||
Clinton | 94 | 100% ELECTRICAL CAPABILITY ONE 345 KV LINE REMOVED FROM SERVICE - RESTORATION ANTICIPATED AT 1600 ON 9/22 | * | ||
D.C. Cook 1 | 0 | 09/15/2006 | REFUELING OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 94 | HP FEEDWATER TRAIN REPAIR | * | ||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 96 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | 1 OF 3 120 Kv LINES IS REMOVED FROM SERVICE - RESTORATION ANTICIPATED AT 1600 HOURS ON 9/20 | |||
Kewaunee | 0 | 09/02/2006 | REFUELING OUTAGE - MOVING FUEL | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 98 | PLANNED AFW TESTING | * | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 0 | 09/19/2006 | REFUELING OUTAGE | * | |
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
Diablo Canyon 1 | 100 | ONE 500 KV LINE WILL BE REMOVED FROM SERVICE 9/22 | |||
Diablo Canyon 2 | 100 | ONE 500 KV LINE WILL BE REMOVED FROM SERVICE 9/22 | |||
Fort Calhoun | 0 | 09/09/2006 | REFUELING OUTAGE - DEFUELED | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 0 | 09/19/2006 | LCO REQUIRED SHUTDOWN | * | |
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | LIMITED DUE TO SG TUBE PLUGGING LIMIT | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 90 | COASTDOWN TO REFUELING OUTAGE | |||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |