Power Reactor Status Report for July 19, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | GRID RELIABILITY GREEN | * | ||
Beaver Valley 2 | 100 | GRID RELIABILITY GREEN | * | ||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | * | |||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 85 | INCREASING POWER TO 100% | * | ||
Peach Bottom 2 | 100 | * | |||
Peach Bottom 3 | 100 | * | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | * | |||
Salem 2 | 100 | * | |||
Seabrook 1 | 100 | * | |||
Susquehanna 1 | 100 | MAXIMUM GENERATION ALERT AND PRIMARY RESERVE ALERT IN EFFECT | * | ||
Susquehanna 2 | 100 | MAXIMUM GENERATION ALERT AND PRIMARY RESERVE ALERT IN EFFECT | * | ||
Three Mile Island 1 | 100 | * | |||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 100 | TVA ISSUED POWER SUPPLY ALERT | |||
Browns Ferry 3 | 100 | TVA ISSUED POWER SUPPLY ALERT | |||
Brunswick 1 | 100 | RELIABILITY ALERT IN EFFECT | * | ||
Brunswick 2 | 100 | RELIABILITY ALERT IN EFFECT | * | ||
Catawba 1 | 100 | POWER DEMAND ORANGE STATUS | |||
Catawba 2 | 100 | POWER DEMAND ORANGE STATUS | |||
Crystal River 3 | 100 | GRID CONDITION RED LAMP ILLUMINATED | * | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | SYSTEM RELIABILITY ALERT BASED ON DEMAND | |||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | * | |||
North Anna 2 | 100 | * | |||
Oconee 1 | 100 | SYSTEM GRID STATUS ORANGE BASED ON DEMAND AND FOSSIL UNIT DOWN | |||
Oconee 2 | 100 | SYSTEM GRID STATUS ORANGE BASED ON DEMAND AND FOSSIL UNIT DOWN | |||
Oconee 3 | 100 | SYSTEM GRID STATUS ORANGE BASED ON DEMAND AND FOSSIL UNIT DOWN | |||
Robinson 2 | 100 | ECC ISSUED RELIABILITY ALERT FOR SYSTEM LOAD | |||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | POWER SUPPLY ALERT IN EFFECT | * | ||
Sequoyah 2 | 100 | POWER SUPPLY ALERT IN EFFECT | * | ||
Summer | 100 | ||||
Surry 1 | 100 | * | |||
Surry 2 | 100 | * | |||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 | POWER SYSTEM ALERT IN EFFECT | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | * | |||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 100 | ||||
Duane Arnold | 96 | 100% ELECTRICAL CAPABILITY INTERRUPTIBLE CUSTOMERS CAN EXPECT TO BE INTERRUPTED | * | ||
Fermi 2 | 0 | 07/08/2006 | PLANNED MAINTENANCE FOR TRANSFORMER ISSUE | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | SYSTEM RELIABILITY YELLOW | * | ||
Palisades | 100 | ||||
Perry 1 | 100 | * | |||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | SYSTEM CONDITION YELLOW | * | ||
Prairie Island 2 | 100 | SYSTEM CONDITION YELLOW | * | ||
Quad Cities 1 | 99 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | * | |||
Arkansas Nuclear 2 | 100 | * | |||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | HANDS-OFF MAINTENANCE FOR NEXT 2 DAYS | |||
Comanche Peak 2 | 100 | HANDS-OFF MAINTENANCE FOR NEXT 2 DAYS | |||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | RESTRICTED MAINTENANCE ORDER | * | ||
Diablo Canyon 2 | 100 | RESTRICTED MAINTENANCE ORDER | * | ||
Fort Calhoun | 100 | CURTAILMENT ALERT | * | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | RESTRICTED MAINTENANCE BETWEEN 0600-2000 HOURS | |||
San Onofre 3 | 100 | RESTRICTED MAINTENANCE BETWEEN 0600-2000 HOURS | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |