Power Reactor Status Report for March 26, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 02/12/2006 DEFUELED    
Beaver Valley 2 100        
Calvert Cliffs 1 0 02/20/2006 DEFUELED    
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 80   INCREASING POWER *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 0 03/19/2006 REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 57   DOWN POWER FOR PLANNED MAINTENANCE *  
Seabrook 1 100        
Susquehanna 1 0 03/03/2006 REFUELING OUTAGE    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 87   HOLDING FOR STEAMLINE VIBRATION RESOLUTION    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 97   INCREASING POWER *  
Brunswick 1 0 03/03/2006 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 87   PERFORMING CONTROL VALVE TESTING ON MAIN TURBINE *  
Catawba 2 0 03/18/2006 DEFUELED *  
Crystal River 3 0 03/17/2006 MAINTENANCE OUTAGE - STEPUP TRANSFORMER REPLACEMENT    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 0 02/12/2006 REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 99   RESOLVING BLOWDOWN FLOW CALCULATION ISSUE    
McGuire 2 99   RESOLVING BLOWDOWN FLOW CALCULATION ISSUE    
North Anna 1 0 03/11/2006 REFUELING OUTAGE *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 94   COASTDOWN TO REFUELING OUTAGE *  
Sequoyah 2 13   INCREASING POWER *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 03/06/2006 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 03/20/2006 LEAK IN RCS. SEE EVENT # 42434    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 83   INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *  
D.C. Cook 1 100        
D.C. Cook 2 0 03/24/2006 REFUELING OUTAGE *  
Davis-Besse 0 03/05/2006 DEFUELED    
Dresden 2 97   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 0 03/25/2006 REFUELING OUTAGE *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 99   MAIN STEAM SAFETY VALVE TESTING *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 85   HOLDING DUE TO ELECTROMATIC RELIEF VALVE ISSUES    
Quad Cities 2 0 03/24/2006 SHUTTING DOWN FOR REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 94   INCREASING POWER *  
Palo Verde 1 0 03/17/2006 PLANNED MAINTENANCE OUTAGE    
Palo Verde 2 99   STEAM GENERATOR BLOWDOWNS *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 01/03/2006 REFUELING OUTAGE    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021