The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 7, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 90   CONDENSER WATERBOX CLEANING    
Beaver Valley 2 100     *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 0 05/06/2005 AUTOMATIC TRIP DUE TO FEEDFLOW / STEAMFLOW MISMATCH SIGNAL. SEE EVENT #41673 * 1
Limerick 1 100        
Limerick 2 60   LOWERING POWER TO WORK ON RECIRC PUMP MG SET *  
Millstone 2 0 04/08/2005 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 68   HOLDING TO INVESTIGATE HIGH STATOR WINDING TEMPERATURE ALSO CONDITIONING NEW TURBINE ROTOR *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 51   CONDENSER WATERBOX CLEANING *  
Peach Bottom 3 100        
Pilgrim 1 0 04/18/2005 REFUELING OUTAGE    
Salem 1 100        
Salem 2 0 04/05/2005 REFUELING OUTAGE *  
Seabrook 1 95   HOLDING FOR DATA *  
Susquehanna 1 74   PLANNED MAINTENANCE AND ROD SEQUENCE EXCHANGE *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 10   DECREASING POWER FOR REFUELING OUTAGE *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100     *  
Farley 2 100        
Harris 1 52   LIMITED DUE TO "B" FEEDWATER TRAIN OUT OF SERVICE *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/08/2005 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 04/24/2005 DEFUELED    
Summer 0 04/23/2005 DEFUELED    
Surry 1 100        
Surry 2 0 04/23/2005 DEFUELED    
Turkey Point 3 100        
Turkey Point 4 0 04/10/2005 DEFUELED    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 93   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 35   HOLDING FOR CONDENSER TUBE LEAK INVESTIGATION *  
Fermi 2 100        
Kewaunee 0 02/20/2005 SHUTDOWN TO RESOLVE AUXILIARY FEEDWATER ISSUE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 19   HOLDING FOR DIGITAL FEEDWATER SYSTEM TESTING *  
Point Beach 1 100        
Point Beach 2 0 04/01/2005 REFUELING OUTAGE *  
Prairie Island 1 100        
Prairie Island 2 0 04/15/2005 REFUELING OUTAGE *  
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/06/2005 REFUELING OUTAGE *  
Comanche Peak 1 92   INCREASING POWER FOLLOWING TURBINE VALVE TESTING *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 02/26/2005 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 04/01/2005 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 0 05/04/2005 PLANNED MAINTENANCE OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/16/2005 REFUELING OUTAGE - DEFUELED    
Wolf Creek 1 0 04/08/2005 REFUELING OUTAGE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021