The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for May 1, 2005
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 90 | HOLDING FOR NI CALIBRATION | * | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 0 | 04/08/2005 | DEFUELED | ||
| Millstone 3 | 73 | INCREASING POWER | * | ||
| Nine Mile Point 1 | 35 | TURBINE WARMUP | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 0 | 04/18/2005 | REFUELING OUTAGE | ||
| Salem 1 | 100 | ||||
| Salem 2 | 0 | 04/05/2005 | REFUELING OUTAGE | ||
| Seabrook 1 | 6 | INCREASING POWER | * | ||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 73 | INCREASING POWER | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 66 | REDUCED POWER FOR FEED PUMP MAINTENANCE | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 70 | REDUCED POWER FOR CONSENSATE PUMP AND WATERBOX MAINTENANCE | * | ||
| Farley 1 | 100 | ||||
| Farley 2 | 68 | REDUCED POWER FOR WATERBOX CLEANING | * | ||
| Harris 1 | 0 | 05/01/2005 | MANUAL TRIP ON LOSS OF A CONDENSATE PUMP - EN #41654 | * | 1 |
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 04/08/2005 | REFUELING OUTAGE | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 04/24/2005 | REFUELING OUTAGE | ||
| Summer | 0 | 04/23/2005 | REFUELING OUTAGE | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 04/23/2005 | REFUELING OUTAGE | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 04/10/2005 | DEFUELED | ||
| Vogtle 1 | 2 | INCREASING POWER | * | ||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 0 | 04/17/2005 | REFUELING OUTAGE | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | * | |||
| Clinton | 92 | 100% ELECTRICAL CAPABILITY | * | ||
| D.C. Cook 1 | 100 | * | |||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 84 | INCREASING POWER | * | ||
| Duane Arnold | 0 | 03/28/2005 | REFUELING OUTAGE | * | |
| Fermi 2 | 100 | ||||
| Kewaunee | 0 | 02/20/2005 | SHUTDOWN TO RESOLVE AUXILIARY FEEDWATER ISSUE | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 0 | 02/21/2005 | REFUELING OUTAGE | ||
| Point Beach 1 | 98 | AUX FEED PUMP SURVEILLANCE TESTING | * | ||
| Point Beach 2 | 0 | 04/01/2005 | REFUELING OUTAGE - DEFUELED | ||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 04/15/2005 | REFUELING OUTAGE | ||
| Quad Cities 1 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) | |||
| Quad Cities 2 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 60 | INCREASING POWER | * | ||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 02/26/2005 | DEFUELED | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 04/01/2005 | REFUELING OUTAGE - DEFUELED | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 04/16/2005 | REFUELING OUTAGE | ||
| Wolf Creek 1 | 0 | 04/08/2005 | REFUELING OUTAGE |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026