Power Reactor Status Report for February 18, 2005
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 95 | COASTDOWN TO REFUELING OUTAGE | |||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 02/16/2005 | STARTUP PREPARATIONS IN PROGRESS FOLLOWING REACTOR TRIP (SEE EN #41414) | ||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 0 | 02/17/2005 | MID-CYCLE MAINTENANCE OUTAGE | * | |
| Limerick 2 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 63 | TURBINE TESTING AND FUEL SIPPING | * | ||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | * | |||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Browns Ferry 3 | 78 | DECREASING POWER TO 53% FOR ROD PATTERN ADJUSTMENTS | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 86 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 0 | 02/04/2005 | REFUELING OUTAGE | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 02/16/2005 | MAINTENANCE OUTAGE | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 90 | INCREASING POWER | * | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 98 | REDUCED POWER DUE TO HTR DRAIN VLV MAINTENANCE | * | ||
| Dresden 2 | 86 | EVALUATING STEAM DRYER MOISTURE CARRYOVER | * | ||
| Dresden 3 | 96 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 94 | 100 % ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 0 | 02/07/2005 | REFUELING OUTAGE | ||
| Monticello | 92 | COASTDOWN TO REFUELING OUTAGE | |||
| Palisades | 100 | ||||
| Perry 1 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 98 | GENERATOR HYDROGEN SEAL OIL SYSTEM ISSUE | |||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) | |||
| Quad Cities 2 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 2 | HEATING UP | * | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 0 | 02/09/2005 | TECHNICAL SPECIFICATION REQUIRED SHUTDOWN - SEE EN # 41389 | * | |
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 85 | CIRC WATER PUMP TRANSFORMER REPAIR | |||
| San Onofre 2 | 0 | 02/15/2005 | OUTAGE TO REPAIR COMPONENT COOLING WATER FLOW ABNORMALITY - SEE EN # 41410 | ||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
| South Texas 2 | 100 | * | |||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |