Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for December 13, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 10/10/2004 VESSEL ASSEMBLY IN PROGRESS *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 99   100% ELECTRICAL CAPABILITY *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 12/03/2004 PLANNED SHUTDOWN DUE TO OIL TANKER SPILL. SEE EN#41240.    
Salem 2 2   STARTUP IN PROGRESS *  
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100     *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 95   THERMAL LIMIT *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 95   INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 10/08/2004 FUEL RELOAD COMPLETE *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100     *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 94   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 79   INCREASING POWER *  
Dresden 3 96   100 % ELECTRICAL CAPABILITY    
Duane Arnold 94   100 % ELECTRICAL CAPABILITY *  
Fermi 2 100        
Kewaunee 90   HOLDING FOR TEST    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 98        
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING) *  
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 96   INCREASING POWER FOLLOWING POWER REDUCTION FOR ROD SCRAM TIME TESTING *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 94   COASTDOWN TO REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 7   HOLDING POWER IN PREPARTION FOR PARALLELING WITH GENERATOR *  
Fort Calhoun 100     *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100     *  
River Bend 1 68   INCREASING POWER *  
San Onofre 2 100        
San Onofre 3 0 09/27/2004 REFUELING    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

Page Last Reviewed/Updated Thursday, March 25, 2021

Page Last Reviewed/Updated Thursday, March 25, 2021