The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 20, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 74   INCREASING POWER *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 10/10/2004 DEFUELED    
Indian Point 2 0 10/22/2004 REFUELING OUTAGE *  
Indian Point 3 100        
Limerick 1 99   REDUCED POWER WHILE EVALUATING FEEDWATER FLOW INSTRUMENTATION    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 11/02/2004 RPV HYDRO IN PROGRESS REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 18   GENERATOR OFF LINE TO FIX HYDROGEN LEAK *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100     *  
Brunswick 1 100        
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100     *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 50   INCREASING POWER *  
Farley 2 100        
Harris 1 100     *  
Hatch 1 100        
Hatch 2 99   100% ELECTRICAL CAPABILITY    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 10/08/2004 DEFUELED    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 15   SYNCH WITH GRID *  
Sequoyah 2 100        
Summer 100        
Surry 1 0 10/30/2004 DEFUELED    
Surry 2 100        
Turkey Point 3 0 09/26/2004 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 99     *  
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100     *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 94   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 0 11/02/2004 SHUTDOWN FOR MAIN TURBINE REPAIR    
Dresden 3 0 10/26/2004 REFUELING OUTAGE *  
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 0 11/05/2004 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS    
Kewaunee 0 10/08/2004 REFUELING OUTAGE *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 58   HOLDING POWER FOR MAIN FEEDWATER PUMP REPAIR. *  
Perry 1 99     *  
Point Beach 1 100        
Point Beach 2 0 11/19/2004 TECH SPEC SHUTDOWN. SEE EVENT 41212. *  
Prairie Island 1 0 09/10/2004 REFUELING OUTAGE - CONOSEALS REPAIRED *  
Prairie Island 2 61   INCREASING REACTOR POWER *  
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/25/2004 DEFUELED    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 10/01/2004 REFUELING OUTAGE    
River Bend 1 13   GETTING READY TO ROLL THE MAIN TURBINE *  
San Onofre 2 0 11/19/2004 AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP ON MAIN GENERATOR TRIP. SEE EVENT 41209. * 1
San Onofre 3 0 09/27/2004 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021