The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for November 7, 2004
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 10/17/2004 | REFUELING OUTAGE | * | |
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | * | |||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 0 | 10/10/2004 | DEFUELED | * | |
| Indian Point 2 | 0 | 10/22/2004 | REFUELING OUTAGE- FUEL MOVEMENT IN PROGRESS | * | |
| Indian Point 3 | 100 | ||||
| Limerick 1 | 99 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 80 | CIRCULATING WATER PUMP MAINTENANCE | * | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 0 | 11/02/2004 | REFUELING OUTAGE | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 75 | REDUCED POWER FOR MAINTENANCE ON CONDENSATE PUMP | * | ||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 71 | INCREASING POWER | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 0 | 10/01/2004 | REFUELING OUTAGE | ||
| Farley 2 | 100 | ||||
| Harris 1 | 0 | 10/15/2004 | PERFORMING LOW POWER PHYSICS TESTING | * | |
| Hatch 1 | 78 | INCREASING POWER AFTER ROD PATTERN ADJUSTMENT AND SEQUENCE EXCHANGE | * | ||
| Hatch 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
| McGuire 1 | 0 | 10/18/2004 | ADDITIONAL MSIV REPAIRS | ||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 10/08/2004 | DEFUELED | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 0 | 10/25/2004 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | ||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 0 | 10/30/2004 | REFUELING OUTAGE- FUEL MOVEMENT IN PROGRESS | * | |
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 09/26/2004 | REFUELING OUTAGE | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 94 | 100% ELECTRICAL CAPABILITY | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 10/01/2004 | REFUELING OUTAGE | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 0 | 11/02/2004 | SHUTDOWN FOR MAIN TURBINE REPAIR | ||
| Dresden 3 | 0 | 10/26/2004 | REFUELING OUTAGE | ||
| Duane Arnold | 94 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 0 | 11/05/2004 | REFUELING OUTAGE | * | |
| Kewaunee | 0 | 10/08/2004 | DEFUELED | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 09/19/2004 | REFUELING OUTAGE - RV HEAD SET - WILL COMMENCE TENSIONING SHORTLY | * | |
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | * | |||
| Prairie Island 1 | 0 | 09/10/2004 | REFUELING OUTAGE | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) | |||
| Quad Cities 2 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING) |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 0 | 11/05/2004 | FORCED MAINTENANCE OUTAGE DUE TO TURBINE VIBRATION PROBLEM | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 0 | 10/25/2004 | DEFUELED | * | |
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 10/01/2004 | DEFUELED | ||
| River Bend 1 | 0 | 10/21/2004 | REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS | ||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 0 | 09/27/2004 | DEFUELED | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026