The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 28, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 09/24/2004 REFUELING OUTAGE *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 97   HOLDING POWER WHILE RESOLVING TURBINE STEAM FLOW/LOAD LIMIT SETPOINT QUESTION *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 70   REDUCED POWER FOR FEEDWATER HEATER LEAK REPAIR    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 55   INCREASING POWER *  
Oyster Creek 100        
Peach Bottom 2 0 09/14/2004 REFUELING OUTAGE    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 19   STARTUP IN PROGRESS *  
Salem 2 98   REDUCED POWER DUE TO HEATER DRAIN PUMP REPAIR    
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 96   MAXIMUM ACHIEVEABLE POWER    
Catawba 1 100        
Catawba 2 0 09/11/2004 DEFUELED    
Crystal River 3 100     *  
Farley 1 95   COASTDOWN TO REFUELING OUTAGE    
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 0 09/24/2004 MAINTENANCE OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/12/2004 REFUELING OUTAGE - CORE RELOAD COMPLETED    
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 09/25/2004 STARTUP PREPARATIONS IN PROGRESS - INSPECTIONS, WATER CLEANUP, ETC. *  
Saint Lucie 2 0 09/25/2004 STARTUP PREPARATIONS IN PROGRESS - INSPECTIONS, WATER CLEANUP, ETC. *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 09/26/2004 REFUELING OUTAGE *  
Turkey Point 4 100     *  
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100     *  
Byron 1 100        
Byron 2 96   REDUCED POWER DUE TO "26A" FW HEATER OUT-OF-SERVICE *  
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 09/19/2004 REFUELING OUTAGE    
Perry 1 84   REDUCED POWER FOR LOAD LINE ADJUSTMENT *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 09/10/2004 REFUELING OUTAGE DEFUELED    
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/27/2004 MAINTENANCE OUTAGE - SHUTDOWN TO REPAIR UNISOLABLE FW INSTRUMENT LINE LEAK *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 0 09/27/2004 REFUELING OUTAGE - PREPARING TO PLACE SHUTDOWN COOLING IN-SERVICE TO ENTER MODE 5 *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 85   REDUCING POWER TO 77% FOR SWITCHYARD MAINTENANCE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.