Power Reactor Status Report for September 11, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100     *  
Calvert Cliffs 1 95   CLEANING WATER BOXES *  
Calvert Cliffs 2 100        
FitzPatrick 87   COASTDOWN TO REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 70   HOLDING POWER FOR MAIN FEED PUMP REPAIR    
Indian Point 3 100        
Limerick 1 68   WATER BOXES AND CONTROL VALVE MAINTENANCE *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 97   COASTDOWN TO REFUELING OUTAGE    
Peach Bottom 3 62   CONTROL ROD SEQUENCE EXCHANGE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 09/09/2004 TURBINE TRIP/REACTOR TRIP. SEE EVENT # 41028.    
Seabrook 1 100        
Susquehanna 1 70   SCRAM AND STROKE TIMING TESTS *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 99     *  
Catawba 2 9   PREPARATIONS TO SHUTDOWN FOR REFUELING OUTAGE *  
Crystal River 3 0 09/06/2004 AUTO REACTOR TRIP RECOVERY    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 99   100% ELECTRICAL CAPABILITY    
McGuire 1 100        
McGuire 2 100        
North Anna 1 97   COASTDOWN TO REFUELING OUTAGE *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 09/04/2004 SHUT DOWN DUE TO HURRICANE FRANCES    
Saint Lucie 2 0 09/03/2004 SHUT DOWN DUE TO HURRICANE FRANCES    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 77   HOLDING POWER FOR HIGH GENERATOR BEARING #9 VIBRATION    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 54   HOLDING FOR CONDENSATE PUMP MAINTENANCE    
Perry 1 100        
Point Beach 1 100     *  
Point Beach 2 100        
Prairie Island 1 0 09/10/2004 ENTERING REFUELING OUTAGE *  
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100     *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100     *  
San Onofre 2 100        
San Onofre 3 85   CIRC WATER PUMP OUTAGE *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021