The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 6, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 95   INCREASING POWER *  
FitzPatrick 100     *  
Ginna 100        
Hope Creek 1 75   INCREASING POWER *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 80   INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 55   INCREASING POWER *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 87   GRID LIMITATIONS *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 97   100% ELECTRICAL CAPABILITY *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 91   PERFORMING ROD EXERCISE AND SEQUENCE EXCHANGE *  
Hatch 2 99   MAXIMUM OPERATING POWER    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 90   INCREASING POWER *  
Oconee 1 100        
Oconee 2 0 03/19/2004 PERFORM MAINTENANCE    
Oconee 3 100        
Robinson 2 100     *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 95   100% GENERATOR CAPACITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPACITY    
Dresden 3 100        
Duane Arnold 76   PERFORMING ROD SEQUENCE EXCHANGE *  
Fermi 2 100        
Kewaunee 98   INCREASING POWER *  
La Salle 1 100        
La Salle 2 23   INCREASING POWER *  
Monticello 100     *  
Palisades 100        
Perry 1 38   HOLDING POWER FOR MAINTENANCE *  
Point Beach 1 0 04/02/2004 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 04/10/2004 REFUELING OUTAGE    
Columbia Generating Station 74   PERFORMING CONTROL ROD MAINTENANCE AND TURBINE VALVE TESTING *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 2   PERFORMING PLANT STARTUP    
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 98   T-HOT LIMITED    
Palo Verde 2 100        
Palo Verde 3 99   T-HOT LIMITED    
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 0 06/04/2004 PERFORMING PLANT STARTUP *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.