The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 4, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 03/20/2004 MAINTENANCE OUTAGE.    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 04/02/2004 REFUELING OUTAGE *  
Nine Mile Point 1 100        
Nine Mile Point 2 0 03/15/2004 REFUELING OUTAGE    
Oyster Creek 65   INCREASING POWER *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 03/30/2004 REFUELING OUTAGE    
Salem 2 97   21 HEATER DRAIN PUMP ISSUE *  
Seabrook 1 100        
Susquehanna 1 0 02/27/2004 REFUELING OUTAGE    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 02/16/2004 DEFUELED *  
Browns Ferry 2 100        
Browns Ferry 3 91   INCREASING POWER *  
Brunswick 1 27   POWER ASCENSION TESTING *  
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 03/12/2004 REFUELING OUTAGE    
Harris 1 52   INCREASING POWER *  
Hatch 1 92   ROD PATTERN CHANGE *  
Hatch 2 98   MAXIMUM OPERATING POWER (MOP)    
McGuire 1 0 03/06/2004 REFUELING OUTAGE *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 03/19/2004 REFUELING OUTAGE DEFUELED    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 03/21/2004 DEFUELED    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 03/30/2004 SHUTDOWN FOR REACTOR COOLANT PUMP SEAL INJECTION LINE MAINTENANCE    
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 95   DOWN POWER FOR FEED PUMP SWAP *  
Byron 1 100        
Byron 2 0 03/22/2004 REFUELING OUTAGE    
Clinton 92   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/30/2004 HEATUP IN PROGRESS *  
D.C. Cook 2 83   INCREASING POWER *  
Davis-Besse 100     *  
Dresden 2 97   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 0 04/02/2004 REFUELING OUTAGE *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 55   MAINTENANCE WORK COMPLETE - PREPARING TO RAISE POWER *  
Quad Cities 1 84   LIMITED IN POWER (STEAM DRYER MONITORING) *  
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 85   CONTROL ROD SEQUENCE EXCHANGE *  
Comanche Peak 1 0 03/27/2004 REFUELING OUTAGE    
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 03/22/2004 DEFUELED    
Diablo Canyon 2 100        
Fort Calhoun 0 03/26/2004 RCP WORK COMPLETE - PREPARING TO START HEATUP *  
Grand Gulf 1 100        
Palo Verde 1 0 04/02/2004 REFUELING OUTAGE *  
Palo Verde 2 100        
Palo Verde 3 99   T-HOT LIMITED    
River Bend 1 100        
San Onofre 2 17   STARTUP IN PROGRESS - PREPARING TO LOAD GENERATOR *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 03/31/2004 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.