The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for March 8, 2004
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 96 | INCREASING POWER | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 0 | 03/01/2004 | REFUELING OUTAGE | ||
| Limerick 2 | 100 | ||||
| Millstone 2 | 3 | PLANT STARTUP | * | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 86 | COASTDOWN TO REFUELING OUTAGE | |||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 0 | 02/27/2004 | REFUELING OUTAGE | ||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | * | |||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 02/16/2004 | DEFUELED | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 0 | 03/01/2004 | REFUELING OUTAGE | ||
| Brunswick 1 | 0 | 02/27/2004 | REFUELING OUTAGE | ||
| Brunswick 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | * | |||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 89 | COASTDOWN TO REFUELING OUTAGE | |||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 02/13/2004 | REFUELING OUTAGE | * | |
| Hatch 2 | 93 | MAXIMUM OPERATING POWER (MOP) | * | ||
| McGuire 1 | 0 | 03/06/2004 | REFUELING OUTAGE | * | |
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 93 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 02/15/2002 | |||
| Dresden 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 87 | MAINTENANCE ACTIVITIES | * | ||
| Duane Arnold | 94 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | * | |||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 95 | * | |||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 85 | LIMITED IN POWER (STEAM DRYER MONITORING). | |||
| Quad Cities 2 | 0 | 02/24/2004 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 99 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 85 | REDUCED POWER DUE TO STATOR CORE COOLING WATER DEGRADATION | |||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | * | |||
| Grand Gulf 1 | 0 | 02/22/2004 | REFUELING OUTAGE | ||
| Palo Verde 1 | 99 | T-HOT LIMITED | |||
| Palo Verde 2 | 0 | 02/19/2004 | PLANT SHUT DOWN DUE TO STEAM GENERATOR TUBE LEAK | * | |
| Palo Verde 3 | 12 | INCREASING POWER | * | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 02/09/2004 | REFUELING OUTAGE | ||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 99 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026