Power Reactor Status Report for October 4, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 09/12/2003 | REFUELING OUTAGE - CORE RELOADED | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 09/15/2003 | REFUELING OUTAGE | * | |
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 90 | REDUCED POWER FOR RECIRC PUMP MG SET MAINTENANCE | |||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | * | |||
| Peach Bottom 2 | 78 | INCREASING POWER FOLLOWING ROD SHUFFLE | * | ||
| Peach Bottom 3 | 0 | 09/14/2003 | REFUELING OUTAGE | ||
| Pilgrim 1 | 0 | 09/29/2003 | FORCED OUTAGE | ||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 0 | 10/03/2003 | ENTERING REFUELING OUTAGE | * | |
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Vermont Yankee | 82 | HOLDING FOR SETPOINT CALIBRATION | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 93 | 100% ELECTRICAL CAPABILITY | |||
| Brunswick 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 10/03/2003 | ENTERING REFUELING OUTAGE | * | |
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 09/05/2003 | POST REFUELING OUTAGE | * | |
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 09/19/2003 | DEFUELED | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 99 | * | |||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 09/18/2003 | REFUELING OUTAGE | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 50 | REDUCED POWER FOR PRE REFUELING OUTAGE MAINTENANCE | * | ||
| Vogtle 1 | 0 | 09/27/2003 | REFUELING OUTAGE | ||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 0 | 09/07/2003 | CORE RELOAD IN-PROGRESS |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 0 | 09/22/2003 | REFUELING OUTAGE | ||
| Byron 2 | 100 | ||||
| Clinton | 91 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 02/15/2002 | AUTOMATIC TRIP (SEE EN#40208).33333 | * | |
| Dresden 2 | 77 | INCREASING POWER | * | ||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 94 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 98 | * | |||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 0 | 10/03/2003 | REFUELING OUTAGE | * | |
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 09/12/2003 | REFUELING OUTAGE | ||
| Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 0 | 09/23/2003 | DEFUELED | ||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 99 | ||||
| Cooper | 100 | * | |||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 09/12/2003 | REFUELING OUTAGE | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 98 | ||||
| Palo Verde 2 | 0 | 09/26/2003 | REFUELING OUTAGE | ||
| Palo Verde 3 | 99 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 86 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Wolf Creek 1 | 100 |