Power Reactor Status Report for September 7, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 97 | MTC TESTING | |||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 93 | COASTDOWN TO REFUELING OUTAGE | |||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 90 | INCREASING POWER | * | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 94 | INCREASING POWER | * | ||
Peach Bottom 3 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Pilgrim 1 | 37 | RECIRC PUMP RECOVERY | * | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 95 | MINIMUM GENERATION ALERT | * | ||
Susquehanna 2 | 83 | INCREASING POWER | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
Brunswick 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Catawba 1 | 0 | 08/28/2003 | STARTUP PREPS | * | |
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | * | |||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 0 | 09/05/2003 | REFUELING OUTAGE | * | |
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 80 | COASTDOWN TO REFUELING OUTAGE | |||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | * | |||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 49 | MFP MAINTENANCE | * | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 47 | EXCESSIVE RCP SEAL LEAKOFF | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 67 | ROD SEQUENCE EXCHANGE | * | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/15/2002 | MAINTENANCE OUTAGE | ||
Dresden 2 | 92 | CONDENSER HEAT REMOVAL TEST | * | ||
Dresden 3 | 97 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 94 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 0 | 09/05/2003 | MAINTENANCE OUTAGE | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 94 | ROD SEQUENCE EXCHANGE | * | ||
Point Beach 1 | 63 | TURBINE STOP VALVE TEST | * | ||
Point Beach 2 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 87 | COASTDOWN TO REFUELING OUTAGE | |||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 77 | COASTDOWN TO REFUELING OUTAGE | |||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 99 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 98 | ||||
Palo Verde 2 | 98 | ||||
Palo Verde 3 | 99 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021