Power Reactor Status Report for April 28, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 04/25/2003 Hot Standby
REFUELING OUTAGE
   
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 04/15/2003 Refueling
REFUELING OUTAGE
   
INDIAN POINT 2 100        
INDIAN POINT 3 48   Power Operation
INCREASING POWER
*  
LIMERICK 1 95   Power Operation
INCREASING POWER
*  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 0 04/26/2003 Hot Shutdown
MAINTENANCE OUTAGE
   
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 0 04/18/2003 Refueling
REFUELING OUTAGE
   
SALEM 1 76   Power Operation
REDUCED POWER FOR SCHEDULED MAINTENANCE.
*  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Cold Shutdown
DEFUELED
   
BROWNS FERRY 2 85   Power Operation
POWER REDUCED FOR REACTOR FEED PUMP MAINTENANCE
   
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
*  
BRUNSWICK 2 96   Power Operation
100% ELECTRICAL CAPABILITY
*  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/28/2003 Hot Shutdown
REFUELING OUTAGE
*  
FARLEY 2 100        
HARRIS 1 0 04/25/2003 Cold Shutdown
REFUELING OUTAGE
   
HATCH 1 0 04/18/2003 Cold Shutdown
MAINTENANCE OUTAGE
   
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/25/2003 Cold Shutdown
REFUELING OUTAGE.
   
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/20/2003 Refueling
REFUELING OUTAGE
   
SEQUOYAH 1 0 03/16/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 04/19/2003 Refueling
REFUELING OUTAGE - DEFUELED
*  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 0 04/14/2003 Cold Shutdown
REFUELING OUTAGE
   
BRAIDWOOD 2 100     *  
BYRON 1 100        
BYRON 2 100        
CLINTON 1 91   Power Operation
100% ELECTRICAL CAPABILITY
   
COOK 1 0 04/23/2003 Cold Shutdown
MAINTENANCE OUTAGE
*  
COOK 2 0 04/23/2003 Hot Shutdown
MAINTENANCE OUTAGE
   
DAVIS BESSE 1 0 02/15/2002 Cold Shutdown
REFUELING OUTAGE
   
DRESDEN 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   
DRESDEN 3 97   Power Operation
100% ELECTRICAL CAPABILITY
   
DUANE ARNOLD 1 93   Power Operation
100% ELECTRICAL CAPABILITY
*  
FERMI 2 0 03/28/2003 Refueling
REFUELING OUTAGE
   
KEWAUNEE 1 0 04/04/2003 Refueling
REFUELING OUTAGE
   
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 04/26/2003 Cold Shutdown
REFUELING OUTAGE
   
PALISADES 1 100        
PERRY 1 0 04/04/2003 Refueling
REFUELING OUTAGE
   
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 98   Power Operation
100% ELECTRICAL CAPABILITY
   
QUAD CITIES 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100   Power Operation
COASTDOWN PREPS
   
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 99        
COOPER 1 85   Power Operation
INCREASING POWER
*  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100     *  
GRAND GULF 1 0 04/24/2003 Startup
PREPARATIONS TO RESTART
   
PALO VERDE 1 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 2 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 3 0 03/28/2003 Hot Shutdown
REFUELING OUTAGE
*  
RIVER BEND 1 98   Power Operation
HOLDING FOR TESTING (10 DAYS)
   
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/25/2003 Cold Shutdown
REFUELING OUTAGE
   
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021