The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for April 16, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 0 | 03/07/2003 | Refueling REFUELING OUTAGE | ||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 0 | 02/14/2003 | Cold Shutdown REFUELING OUTAGE | ||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 0 | 04/15/2003 | Hot Shutdown SHUT DOWN FOR REFUELING OUTAGE | * | |
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 0 | 03/28/2003 | Cold Shutdown REFUELING OUTAGE | ||
| LIMERICK 1 | 100 | * | |||
| LIMERICK 2 | 100 | ||||
| MILLSTONE 2 | 100 | ||||
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 0 | 03/14/2003 | Cold Shutdown REFUELING OUTAGE | ||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 99 | Power Operation INCREASING POWER | * | ||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 98 | Power Operation COASTDOWN TO REFUELING OUTAGE | * | ||
| SALEM 1 | 100 | ||||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 0 | 03/07/2003 | Cold Shutdown REFUELING OUTAGE | ||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | Cold Shutdown DEFUELED | ||
| BROWNS FERRY 2 | 100 | ||||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 94 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| BRUNSWICK 2 | 97 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 45 | Power Operation SINGLE RECIRCULATION LOOP | * | ||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 0 | 02/22/2003 | Cold Shutdown REFUELING OUTAGE | ||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 82 | Power Operation COASTDOWN TO REFUELING OUTAGE | * | ||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 0 | 03/16/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| SEQUOYAH 2 | 100 | * | |||
| SUMMER 1 | 100 | ||||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 0 | 04/14/2003 | Cold Shutdown REFUELING OUTAGE | * | |
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 100 | ||||
| CLINTON 1 | 91 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 0 | 02/15/2002 | Cold Shutdown REFUELING OUTAGE | ||
| DRESDEN 2 | 97 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| DRESDEN 3 | 98 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| DUANE ARNOLD 1 | 0 | 03/23/2003 | Cold Shutdown REFUELING OUTAGE | * | |
| FERMI 2 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE | ||
| KEWAUNEE 1 | 0 | 04/04/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 0 | 03/16/2003 | Cold Shutdown REFUELING OUTAGE | ||
| PERRY 1 | 0 | 04/04/2003 | Refueling REFUELING OUTAGE | ||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 1 | Startup INCREASING POWER | * | ||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 98 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| QUAD CITIES 2 | 97 | Power Operation 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COLUMBIA GENERATING | 100 | ||||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 3 | Startup INCREASING POWER | * | ||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 8 | Power Operation INCREASING POWER | * | ||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 98 | Power Operation RCS T hot Temperature Limited | |||
| PALO VERDE 2 | 98 | Power Operation RCS T hot Temperature Limited | |||
| PALO VERDE 3 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| RIVER BEND 1 | 68 | Power Operation ON HOLD FOR FEED PUMP C WORK | * | ||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 100 | ||||
| SOUTH TEXAS 1 | 0 | 03/25/2003 | Cold Shutdown REFUELING OUTAGE | ||
| SOUTH TEXAS 2 | 100 | ||||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026