Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for April 16, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 03/07/2003 Refueling
REFUELING OUTAGE
   
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 02/14/2003 Cold Shutdown
REFUELING OUTAGE
   
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 04/15/2003 Hot Shutdown
SHUT DOWN FOR REFUELING OUTAGE
*  
INDIAN POINT 2 100        
INDIAN POINT 3 0 03/28/2003 Cold Shutdown
REFUELING OUTAGE
   
LIMERICK 1 100     *  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 0 03/14/2003 Cold Shutdown
REFUELING OUTAGE
   
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 99   Power Operation
INCREASING POWER
*  
PEACH BOTTOM 3 100        
PILGRIM 1 98   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/07/2003 Cold Shutdown
REFUELING OUTAGE
   
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Cold Shutdown
DEFUELED
   
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
   
BRUNSWICK 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/28/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 45   Power Operation
SINGLE RECIRCULATION LOOP
*  
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 0 02/22/2003 Cold Shutdown
REFUELING OUTAGE
   
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 82   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 0 03/16/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
SEQUOYAH 2 100     *  
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 0 04/14/2003 Cold Shutdown
REFUELING OUTAGE
*  
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 91   Power Operation
100% ELECTRICAL CAPABILITY
   
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 Cold Shutdown
REFUELING OUTAGE
   
DRESDEN 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   
DRESDEN 3 98   Power Operation
100% ELECTRICAL CAPABILITY
   
DUANE ARNOLD 1 0 03/23/2003 Cold Shutdown
REFUELING OUTAGE
*  
FERMI 2 0 03/28/2003 Refueling
REFUELING OUTAGE
   
KEWAUNEE 1 0 04/04/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 0 03/16/2003 Cold Shutdown
REFUELING OUTAGE
   
PERRY 1 0 04/04/2003 Refueling
REFUELING OUTAGE
   
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 1   Startup
INCREASING POWER
*  
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 98   Power Operation
100% ELECTRICAL CAPABILITY
   
QUAD CITIES 2 97   Power Operation
100% ELECTRICAL CAPABILITY
   

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 3   Startup
INCREASING POWER
*  
DIABLO CANYON 1 100        
DIABLO CANYON 2 8   Power Operation
INCREASING POWER
*  
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 2 98   Power Operation
RCS T hot Temperature Limited
   
PALO VERDE 3 0 03/28/2003 Refueling
REFUELING OUTAGE - DEFUELED
   
RIVER BEND 1 68   Power Operation
ON HOLD FOR FEED PUMP C WORK
*  
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/25/2003 Cold Shutdown
REFUELING OUTAGE
   
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        