The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for March 8, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 0 | 03/07/2003 | Hot Shutdown REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS | * | |
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 0 | 02/14/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| FITZPATRICK 1 | 55 | Power Operation HOLDING POWER FOR MAINTENANCE ON "B" REACTOR FEED PUMP | * | ||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 0 | 03/07/2003 | Hot Shutdown RCS COOLDOWN IN PROGRESS | * | |
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 0 | 03/03/2003 | Refueling REFUELING OUTAGE | * | |
| MILLSTONE 2 | 0 | 03/07/2003 | Hot Shutdown PLANT DECLARED UNUSUAL EVENT DUE TO REACTOR TRIP WITH LEAKAGE FROM CHARGINGSYSTEM - SEE EVENTS #39644 AND 39655. | * | 1 |
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 0 | 03/07/2003 | Hot Shutdown REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS | * | |
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | Refueling DEFUELED | ||
| BROWNS FERRY 2 | 0 | 02/24/2003 | Refueling SHUTDOWN FOR REFUELING OUTAGE | ||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 94 | Power Operation 100% ELECTRICAL POWER | |||
| BRUNSWICK 2 | 0 | 03/07/2003 | Hot Shutdown REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS | * | |
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 0 | 02/28/2003 | Refueling REFUELING OUTAGE - DEFUELED | * | |
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 0 | 02/28/2003 | Refueling REFUELING OUTAGE | ||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 0 | 02/22/2003 | Refueling REFUELING OUTAGE - DEFUELED | ||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 100 | ||||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 0 | 02/28/2003 | Refueling REFUELING OUTAGE | ||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 100 | ||||
| CLINTON 1 | 91 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 0 | 02/15/2002 | Refueling REFUELING OUTAGE | ||
| DRESDEN 2 | 96 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| DRESDEN 3 | 97 | Power Operation 100% ELECTRICAL CAPABILITY | |||
| DUANE ARNOLD 1 | 94 | Power Operation 100% ELECTRICAL CAPABILITY | * | ||
| FERMI 2 | 100 | ||||
| KEWAUNEE 1 | 100 | ||||
| LASALLE 1 | 61 | Power Operation TESTING FOR FUEL LEAKAGE | * | ||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 83 | Power Operation COASTDOWN TO REFUELING OUTAGE | * | ||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 98 | Power Operation 100% ELECTRICAL CAPABILITY | * | ||
| QUAD CITIES 2 | 96 | Power Operation 100% ELECTRICAL CAPABILITY | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COLUMBIA GENERATING | 0 | 02/28/2003 | Cold Shutdown REPAIR EDG 1. (SEE EN#39625). | * | |
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 0 | 02/23/2003 | Refueling REFUELING OUTAGE | * | |
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 0 | 02/03/2003 | Refueling REFUELING OUTAGE | ||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 97 | Power Operation RCS T hot Temperature Limited | |||
| PALO VERDE 2 | 98 | Power Operation RCS T hot Temperature Limited | |||
| PALO VERDE 3 | 99 | Power Operation RCS T hot Temperature Limited | |||
| RIVER BEND 1 | 88 | Power Operation COASTDOWN TO REFUELING OUTAGE | |||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 98 | Power Operation HOLDING POWER FOR COMPLETION OF ENGINEERING EVALUATION | |||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 0 | 01/24/2003 | Hot Standby MAINTENANCE OUTAGE | ||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026