The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 18, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 11/11/2002 Cold Shutdown
MAINTENANCE OUTAGE
   
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 0 10/25/2002 Refueling
REFUELING OUTAGE - CORE RELOAD COMPLETE
   
INDIAN POINT 3 0 11/15/2002 Hot Standby
MAINTENANCE OUTAGE. SEE EVENT#39375.
   
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 0 11/11/2002 Cold Shutdown
MAINTENANCE OUTAGE
   
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Refueling
DEFUELED
   
BROWNS FERRY 2 100     *  
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
   
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 85   Power Operation
MAINTENANCE OUTAGE
*  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100     *  
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100   Power Operation
PLANS TO TERMINATE UE THIS MORNING - CURRENT LAKE LEVEL IS 246.7 FT
*  
NORTH ANNA 2 0 09/07/2002 Refueling
PLANS TO TERMINATE UE THIS MORNING - CURRENT LAKE LEVEL IS 246.7 FT REFUELING OUTAGE - DEFUELED
*  
OCONEE 1 100        
OCONEE 2 0 10/11/2002 Cold Shutdown
REFUELING OUTAGE - COMPLETED REFUELING
   
OCONEE 3 100     *  
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 70   Power Operation
INCREASING POWER
*  
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 92   Power Operation
100% ELECTRICAL CAPABILITY
   
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
DRESDEN 2 96   Power Operation
100% ELECTRICAL CAPABILITY
*  
DRESDEN 3 97   Power Operation
100% ELECTRICAL CAPABILITY
   
DUANE ARNOLD 1 93   Power Operation
100% ELECTRICAL CAPABILITY
*  
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 0 11/15/2002 Cold Shutdown
REFUELING - MANUAL RX TRIP DUE TO HIGH FEEDWATER HEATER LEVEL - SEE EVENT #39376
   
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 11/05/2002 Refueling
REFUELING OUTAGE
   
QUAD CITIES 2 97        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 10/22/2002 Cold Shutdown
REFUELING OUTAGE
   
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 3   Startup
INCREASING POWER
*  
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 0 10/20/2002 Cold Shutdown
SCHEDULED MAINTENANCE OUTAGE
   
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98        
PALO VERDE 2 98   Power Operation
TEMPERATURE LIMITED
   
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 11/16/2002 Hot Standby
MANUAL REACTOR TRIP - EVENT 39380
   
SOUTH TEXAS 2 0 10/01/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021