The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 10, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 94   Power Operation
CLEANING WATER BOXES
*  
FITZPATRICK 1 98   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 0 09/06/2002 Cold Shutdown
REFUELING OUTAGE
   
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100     *  
PEACH BOTTOM 2 85   Power Operation
COASTDOWN TO REFUELING OUTAGE
   
PEACH BOTTOM 3 100        
PILGRIM 1 43   Power Operation
BACKWASHING MAIN CONDENSERS
*  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100     *  
SUSQUEHANNA 2 99     *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Refueling
DEFUELED
   
BROWNS FERRY 2 68   Power Operation
INCREASING POWER AFTER POWER SUPPRESSION TESTING
*  
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
   
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 94   Power Operation
COASTDOWN FOR REFUELING OUTAGE
*  
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 98   Power Operation
COASTDOWN FOR REFUELING OUTAGE
*  
MCGUIRE 2 100        
NORTH ANNA 1 100   Power Operation
UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.6FT.
   
NORTH ANNA 2 0 09/07/2002 Cold Shutdown
UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.6FT REFUELING OUTAGE
   
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 98   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
CLINTON 1 94   Power Operation
100% ELECTRICAL CAPABILITY
*  
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
DRESDEN 2 98   Power Operation
100% ELECTRICAL CAPABILITY
   
DRESDEN 3 93   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
DUANE ARNOLD 1 43   Power Operation
HOLDING POWER
*  
FERMI 2 100        
KEWAUNEE 1 100     *  
LASALLE 1 100        
LASALLE 2 100     *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100     *  
QUAD CITIES 2 98   Power Operation
100% ELECTRICAL CAPABILITY
   

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 96   Power Operation
COASTDOWN TO REFUELING OUTAGE
*  
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 99   Power Operation
100% ELECTRICAL CAPABILITY
   
COOPER 1 100        
DIABLO CANYON 1 98   Power Operation
Limited due to high turbine vibration
   
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 86   Power Operation
COASTDOWN TO REFUELING OUTAGE
   
PALO VERDE 1 99        
PALO VERDE 2 98        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 97   Power Operation
TROUBLESHOOTING MAIN TURBINE CONTROL VALVE
*  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021