The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 19, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 02/15/2002 REFUELING OUTAGE - REFUELED    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 20   HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE AS PART OF A MAINTENANCE OUTAGE TO REPAIR A TURBINE TRIP SOLENOID - PREPARING TO PLACE THE UNIT ON LINE *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 0 05/19/2002 AUTOMATIC REACTOR SCRAM FROM 94% POWER DUE TO A TURBINE TRIP FOR UNKNOWN REASONS (Refer to event #38927) * 1
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 95   INCREASING POWER/PRECONDITIONING FOR 100% POWER AFTER EXITING A MAINTENANCE OUTAGE *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 88   INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM HOTWELL MAINTENANCE *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100     *  
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 74   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
SEABROOK 1 0 05/04/2002 REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD TENSIONING IN PROGRESS *  
SUSQUEHANNA 1 98        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 0 05/11/2002 MID-CYCLE MAINTENANCE OUTAGE - FUEL MOVES COMPLETE - REACTOR VESSEL HEAD REMOVED *  

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 60   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
CATAWBA 2 100        
CRYSTAL RIVER 3 17   MAINTENANCE OUTAGE - PREPARING TO PLACE THE UNIT ON LINE *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 61   HOLDING POWER AT THIS LEVEL TO PERFORM WATERBOX REPAIRS *  
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 0 04/14/2002 REFUELING OUTAGE - MANUAL REACTOR TRIP FROM MODE 2 (Startup) DUE TO A CONTROL ROD SYSTEM URGENT FAILURE ALARM DURING LOW POWER PHYSICS TESTING ON 05/19/02 - POSSIBLY DUE TO A BLOWN FUSE IN THE ROD CONTROL CABINET (Refer to event #38928) * 1
SUMMER 1 0 04/19/2002 REFUELING OUTAGE - REFUELED *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100     *  
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 25   DECREASING POWER TO 20% TO PERFORM FEEDWATER REGULATING VALVE REPAIRS *  
BYRON 2 100   MEASURED STEAM GENERATOR TUBE LEAKAGE = 30 GPD *  
CLINTON 1 92   INCREASING POWER - PERFORMING EXTENDED POWER UPRATE TESTING *  
COOK 1 0 05/04/2002 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 REFUELING OUTAGE - FUEL SHUFFLE COMPLETE    
DRESDEN 2 96   100% ELECTRICAL CAPABILITY    
DRESDEN 3 83   HOLDING POWER AT THIS LEVEL TO PERFORM A FEEDWATER PUMP SWAP *  
DUANE ARNOLD 1 23   DECREASING POWER TO PERFORM CONDENSER TUBE LEAK REPAIRS AS PART OF A MAINTENANCE OUTAGE - PLAN TO GO TO CONDITION 4 *  
FERMI 2 100     *  
KEWAUNEE 1 100        
LASALLE 1 0 05/18/2002 MAINTENANCE OUTAGE - REACTOR VESSEL HEAD DETENSIONING IN PROGRESS *  
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 55   INCREASING POWER AFTER DECREASING TO LESS THAN 25% POWER TO ADD OIL TO A PRIMARY COOLANT PUMP *  
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 88   INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM A ROD SHUFFLE *  
QUAD CITIES 2 96   100% ELECTRICAL POWER    

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100     *  
COMANCHE PEAK 2 100        
COOPER 1 0 05/14/2002 MAINTENANCE OUTAGE *  
DIABLO CANYON 1 0 04/28/2002 REFUELING OUTAGE - REFUELED    
DIABLO CANYON 2 100        
FT CALHOUN 1 0 05/03/2002 REFUELING OUTAGE - DEFUELED    
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 98     *  
PALO VERDE 3 99        
RIVER BEND 1 100     *  
SAN ONOFRE 2 97   COASTDOWN TO REFUELING OUTAGE    
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100     *  
WATERFORD 3 94   DECREASING POWER TO 90% TO PERFORM TURBINE VALVE TESTING *  
WOLF CREEK 1 0 05/13/2002 MAINTENANCE OUTAGE - PREPARING FOR REACTOR STARTUP *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours