Power Reactor Status Report for May 19, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 0 | 02/15/2002 | REFUELING OUTAGE - REFUELED | ||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 20 | HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE AS PART OF A MAINTENANCE OUTAGE TO REPAIR A TURBINE TRIP SOLENOID - PREPARING TO PLACE THE UNIT ON LINE | * | ||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 0 | 05/19/2002 | AUTOMATIC REACTOR SCRAM FROM 94% POWER DUE TO A TURBINE TRIP FOR UNKNOWN REASONS (Refer to event #38927) | * | 1 |
| LIMERICK 2 | 100 | ||||
| MILLSTONE 2 | 100 | ||||
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 95 | INCREASING POWER/PRECONDITIONING FOR 100% POWER AFTER EXITING A MAINTENANCE OUTAGE | * | ||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 88 | INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM HOTWELL MAINTENANCE | * | ||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | * | |||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 74 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
| SEABROOK 1 | 0 | 05/04/2002 | REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD TENSIONING IN PROGRESS | * | |
| SUSQUEHANNA 1 | 98 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 0 | 05/11/2002 | MID-CYCLE MAINTENANCE OUTAGE - FUEL MOVES COMPLETE - REACTOR VESSEL HEAD REMOVED | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 100 | ||||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 100 | ||||
| CATAWBA 1 | 60 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 17 | MAINTENANCE OUTAGE - PREPARING TO PLACE THE UNIT ON LINE | * | ||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 61 | HOLDING POWER AT THIS LEVEL TO PERFORM WATERBOX REPAIRS | * | ||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 0 | 04/14/2002 | REFUELING OUTAGE - MANUAL REACTOR TRIP FROM MODE 2 (Startup) DUE TO A CONTROL ROD SYSTEM URGENT FAILURE ALARM DURING LOW POWER PHYSICS TESTING ON 05/19/02 - POSSIBLY DUE TO A BLOWN FUSE IN THE ROD CONTROL CABINET (Refer to event #38928) | * | 1 |
| SUMMER 1 | 0 | 04/19/2002 | REFUELING OUTAGE - REFUELED | * | |
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | * | |||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 25 | DECREASING POWER TO 20% TO PERFORM FEEDWATER REGULATING VALVE REPAIRS | * | ||
| BYRON 2 | 100 | MEASURED STEAM GENERATOR TUBE LEAKAGE = 30 GPD | * | ||
| CLINTON 1 | 92 | INCREASING POWER - PERFORMING EXTENDED POWER UPRATE TESTING | * | ||
| COOK 1 | 0 | 05/04/2002 | REFUELING OUTAGE - DEFUELED | ||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 0 | 02/15/2002 | REFUELING OUTAGE - FUEL SHUFFLE COMPLETE | ||
| DRESDEN 2 | 96 | 100% ELECTRICAL CAPABILITY | |||
| DRESDEN 3 | 83 | HOLDING POWER AT THIS LEVEL TO PERFORM A FEEDWATER PUMP SWAP | * | ||
| DUANE ARNOLD 1 | 23 | DECREASING POWER TO PERFORM CONDENSER TUBE LEAK REPAIRS AS PART OF A MAINTENANCE OUTAGE - PLAN TO GO TO CONDITION 4 | * | ||
| FERMI 2 | 100 | * | |||
| KEWAUNEE 1 | 100 | ||||
| LASALLE 1 | 0 | 05/18/2002 | MAINTENANCE OUTAGE - REACTOR VESSEL HEAD DETENSIONING IN PROGRESS | * | |
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 55 | INCREASING POWER AFTER DECREASING TO LESS THAN 25% POWER TO ADD OIL TO A PRIMARY COOLANT PUMP | * | ||
| PERRY 1 | 100 | ||||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 88 | INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM A ROD SHUFFLE | * | ||
| QUAD CITIES 2 | 96 | 100% ELECTRICAL POWER |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COLUMBIA GENERATING | 100 | ||||
| COMANCHE PEAK 1 | 100 | * | |||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 0 | 05/14/2002 | MAINTENANCE OUTAGE | * | |
| DIABLO CANYON 1 | 0 | 04/28/2002 | REFUELING OUTAGE - REFUELED | ||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 0 | 05/03/2002 | REFUELING OUTAGE - DEFUELED | ||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 99 | ||||
| PALO VERDE 2 | 98 | * | |||
| PALO VERDE 3 | 99 | ||||
| RIVER BEND 1 | 100 | * | |||
| SAN ONOFRE 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| SAN ONOFRE 3 | 100 | ||||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 100 | * | |||
| WATERFORD 3 | 94 | DECREASING POWER TO 90% TO PERFORM TURBINE VALVE TESTING | * | ||
| WOLF CREEK 1 | 0 | 05/13/2002 | MAINTENANCE OUTAGE - PREPARING FOR REACTOR STARTUP | * |