Power Reactor Status Report for March 24, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BEAVER VALLEY 1 | 100 | | | | |
BEAVER VALLEY 2 | 100 | | | | |
CALVERT CLIFFS 1 | 0 | 02/15/2002 | REFUELING OUTAGE - DEFUELED | | |
CALVERT CLIFFS 2 | 100 | | | | |
FITZPATRICK 1 | 100 | | | | |
GINNA 1 | 0 | 03/18/2002 | REFUELING OUTAGE - PREPARING TO OFFLOAD FUEL | * | |
HOPE CREEK 1 | 80 | | INCREASING POWER AFTER DECREASING TO 75% POWER TO PERFORM ROD PATTERN ADJUSTMENTS | * | |
INDIAN POINT 2 | 100 | | | * | |
INDIAN POINT 3 | 100 | | | | |
LIMERICK 1 | 30 | | HOLDING POWER AT THIS LEVEL DUE TO A CONDENSATE PUMP PROBLEM AFTER EXITING A REFUELING OUTAGE | * | |
LIMERICK 2 | 80 | | INCREASING POWER AFTER HOLDING AT 80% POWER TO PERFORM WATERBOX CLEANING | * | |
MILLSTONE 2 | 0 | 02/15/2002 | REFUELING OUTAGE | | |
MILLSTONE 3 | 100 | | | | |
NINE MILE POINT 1 | 100 | | | | |
NINE MILE POINT 2 | 0 | 03/15/2002 | REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE - REMOVING CONTROL ROD DRIVES | | |
OYSTER CREEK 1 | 100 | | | | |
PEACH BOTTOM 2 | 100 | | | * | |
PEACH BOTTOM 3 | 82 | | HOLDING POWER AT THIS LEVEL DUE TO A CONDENSATE PUMP PROBLEM | | |
PILGRIM 1 | 100 | | | | |
SALEM 1 | 100 | | | | |
SALEM 2 | 100 | | | | |
SEABROOK 1 | 100 | | | | |
SUSQUEHANNA 1 | 0 | 03/02/2002 | REFUELING OUTAGE - REFUELED | | |
SUSQUEHANNA 2 | 100 | | | | |
THREE MILE ISLAND 1 | 100 | | | | |
VERMONT YANKEE 1 | 91 | | HOLDING POWER AT THIS LEVEL DUE TO FUEL PIN LEAKS | * | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | | |
BROWNS FERRY 2 | 85 | | HOLDING POWER AT THIS LEVEL TO PERFORM A FUEL SOAK | * | |
BROWNS FERRY 3 | 87 | | COASTDOWN TO REFUELING OUTAGE | | |
BRUNSWICK 1 | 0 | 03/01/2002 | REFUELING OUTAGE | * | |
BRUNSWICK 2 | 100 | | | | |
CATAWBA 1 | 100 | | | | |
CATAWBA 2 | 100 | | | * | |
CRYSTAL RIVER 3 | 100 | | | | |
FARLEY 1 | 100 | | | | |
FARLEY 2 | 100 | | | | |
HARRIS 1 | 100 | | | | |
HATCH 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
HATCH 2 | 100 | | | | |
MCGUIRE 1 | 100 | | | | |
MCGUIRE 2 | 0 | 02/22/2002 | REFUELING OUTAGE | * | |
NORTH ANNA 1 | 100 | | | | |
NORTH ANNA 2 | 100 | | | | |
OCONEE 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
OCONEE 2 | 100 | | | | |
OCONEE 3 | 100 | | | | |
ROBINSON 2 | 100 | | | | |
SAINT LUCIE 1 | 100 | | | | |
SAINT LUCIE 2 | 100 | | | | |
SEQUOYAH 1 | 100 | | | | |
SEQUOYAH 2 | 100 | | | | |
SUMMER 1 | 100 | | | | |
SURRY 1 | 100 | | | | |
SURRY 2 | 0 | 03/24/2002 | REFUELING OUTAGE | * | |
TURKEY POINT 3 | 100 | | | | |
TURKEY POINT 4 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
VOGTLE 1 | 0 | 03/06/2002 | REFUELING OUTAGE - DEFUELED | | |
VOGTLE 2 | 100 | | | | |
WATTS BAR 1 | 100 | | | * | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BRAIDWOOD 1 | 100 | | | | |
BRAIDWOOD 2 | 96 | | 100% ELECTRICAL CAPABILITY | | |
BYRON 1 | 0 | 03/11/2002 | REFUELING OUTAGE - REACTOR VESSEL HEAD TENSIONING IN PROGRESS | * | |
BYRON 2 | 100 | | MEASURED STEAM GENERATOR TUBE LEAKAGE LESS THAN 5 GPD | * | |
CLINTON 1 | 99 | | COASTDOWN TO REFUELING OUTAGE | * | |
COOK 1 | 100 | | | | |
COOK 2 | 90 | | HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A TURBINE CONTROL SYSTEM PROBLEM | * | |
DAVIS BESSE 1 | 0 | 02/15/2002 | REFUELING OUTAGE - REFUELED | | |
DRESDEN 2 | 95 | | 100% ELECTRICAL CAPABILITY | | |
DRESDEN 3 | 22 | | MAINTENANCE OUTAGE - STARTUP IN PROGRESS - PREPARING TO PLACE THE UNIT ON LINE | * | |
DUANE ARNOLD 1 | 94 | | 100% ELECTRICAL CAPABILITY | | |
FERMI 2 | 100 | | | | |
KEWAUNEE 1 | 100 | | | | |
LASALLE 1 | 100 | | | | |
LASALLE 2 | 100 | | | | |
MONTICELLO 1 | 100 | | | | |
PALISADES 1 | 100 | | | | |
PERRY 1 | 100 | | | | |
POINT BEACH 1 | 68 | | INCREASING POWER AFTER DECREASING TO 33% POWER TO PERFORM REACTOR COOLANT SYSTEM PRESSURE TRANSMITTER WORK, MAIN FEEDWATER PUMP WORK, AND TURBINE CONTROL VALVE TESTING | * | |
POINT BEACH 2 | 100 | | | | |
PRAIRIE ISLAND 1 | 100 | | | | |
PRAIRIE ISLAND 2 | 100 | | | | |
QUAD CITIES 1 | 100 | | | | |
QUAD CITIES 2 | 95 | | 100% ELECTRICAL CAPABILITY | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
ARKANSAS NUCLEAR 1 | 100 | | | | |
ARKANSAS NUCLEAR 2 | 100 | | | | |
CALLAWAY 1 | 100 | | | | |
COLUMBIA GENERATING | 100 | | | | |
COMANCHE PEAK 1 | 100 | | | | |
COMANCHE PEAK 2 | 99 | | COASTDOWN TO REFUELING OUTAGE | * | |
COOPER 1 | 68 | | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE CONTROL VALVE TESTING | * | |
DIABLO CANYON 1 | 100 | | | | |
DIABLO CANYON 2 | 100 | | | | |
FT CALHOUN 1 | 98 | | | | |
GRAND GULF 1 | 100 | | | | |
PALO VERDE 1 | 99 | | | | |
PALO VERDE 2 | 0 | 03/15/2002 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | | |
PALO VERDE 3 | 99 | | | | |
RIVER BEND 1 | 100 | | | | |
SAN ONOFRE 2 | 100 | | | | |
SAN ONOFRE 3 | 100 | | | | |
SOUTH TEXAS 1 | 100 | | | | |
SOUTH TEXAS 2 | 100 | | | | |
WATERFORD 3 | 0 | 03/22/2002 | REFUELING OUTAGE - ALERT DECLARED AND TERMINATED ON 03/23 DUE TO INABILITY TO OPEN REACTOR COOLANT LOOP SUCTION ISOLATION VALVES FOR REMOVAL OF DECAY HEAT VIA THE SHUTDOWN COOLING MODE OF THE LOW PRESSURE SAFETY INJECTION SYSTEM (Refer to event #38796) | * | |
WOLF CREEK 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.