Power Reactor Status Report for March 23, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | ||||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 0 | 02/15/2002 | REFUELING OUTAGE - DEFUELED | ||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 100 | * | |||
GINNA 1 | 0 | 03/18/2002 | REFUELING OUTAGE | ||
HOPE CREEK 1 | 93 | INCREASING POWER AFTER HOLDING NEAR 60% POWER TO PERFORM FLUX SUPPRESSION TESTING | * | ||
INDIAN POINT 2 | 94 | INCREASING POWER AFTER DECREASING TO 90% POWER TO PERFORM TURBINE STOP VALVE TESTING | * | ||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 50 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 0 | 02/15/2002 | REFUELING OUTAGE | * | |
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 0 | 03/15/2002 | REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE - REMOVING CONTROL ROD DRIVES | * | |
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 92 | INCREASING POWER AFTER DECREASING TO 85% POWER TO PERFORM A CONTROL ROD EXCHANGE | * | ||
PEACH BOTTOM 3 | 82 | HOLDING POWER AT THIS LEVEL DUE TO A CONDENSATE PUMP PROBLEM | * | ||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 100 | ||||
SEABROOK 1 | 100 | ||||
SUSQUEHANNA 1 | 0 | 03/02/2002 | REFUELING OUTAGE - REFUELED | * | |
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 91 | REDUCED POWER DUE TO FUEL PIN LEAKS |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 73 | INCREASING POWER AFTER DECREASING TO 65% TO PERFORM POWER SUPPRESSION TESTING | * | ||
BROWNS FERRY 3 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
BRUNSWICK 1 | 0 | 03/01/2002 | REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD PLACEMENT IN PROGRESS | * | |
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 93 | INCREASING POWER AFTER DECREASING TO 87% POWER TO PERFORM TURBINE CONTROL VALVE TESTING | * | ||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
HATCH 2 | 100 | ||||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 0 | 02/22/2002 | REFUELING OUTAGE | ||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 100 | ||||
SURRY 1 | 100 | ||||
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 0 | 03/23/2002 | REFUELING OUTAGE | * | |
VOGTLE 1 | 0 | 03/06/2002 | REFUELING OUTAGE - DEFUELED | ||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 71 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 96 | 100% ELECTRICAL CAPABILITY | * | ||
BYRON 1 | 0 | 03/11/2002 | REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD SET BUT NOT TENSIONED | * | |
BYRON 2 | 100 | MEASURED STEAM GENERATOR TUBE LEAKAGE = 4.9 GPD | * | ||
CLINTON 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
COOK 1 | 100 | ||||
COOK 2 | 96 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | ||
DAVIS BESSE 1 | 0 | 02/15/2002 | REFUELING OUTAGE - REFUELED | ||
DRESDEN 2 | 95 | 100% ELECTRICAL CAPABILITY | |||
DRESDEN 3 | 0 | 03/15/2002 | MAINTENANCE OUTAGE | * | |
DUANE ARNOLD 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
FERMI 2 | 100 | ||||
KEWAUNEE 1 | 100 | ||||
LASALLE 1 | 100 | ||||
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 100 | ||||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 95 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COLUMBIA GENERATING | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 98 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 99 | ||||
PALO VERDE 2 | 0 | 03/15/2002 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | * | |
PALO VERDE 3 | 99 | ||||
RIVER BEND 1 | 100 | ||||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | ||||
WATERFORD 3 | 0 | 03/22/2002 | REFUELING OUTAGE | * | |
WOLF CREEK 1 | 0 | 03/23/2002 | REFUELING OUTAGE | * |
Page Last Reviewed/Updated Thursday, March 25, 2021