The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for February 2, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 100 | ||||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
| LIMERICK 2 | 100 | ||||
| MILLSTONE 2 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 62 | HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE | * | ||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 89 | COASTDOWN TO REFUELING OUTAGE | * | ||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 100 | ||||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | COASTDOWN TO REFUELING OUTAGE | * | ||
| BRUNSWICK 2 | 100 | ||||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 50 | HOLDING POWER AT THIS LEVEL TO REPAIR THE 1B CONDENSATE BOOSTER PUMP | * | ||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 98 | HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT FEEDWATER HEATER PROBLEMS | * | ||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 95 | 100% ELECTRICAL CAPABILITY | |||
| BYRON 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
| BYRON 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| CLINTON 1 | 100 | ||||
| COOK 1 | 100 | ||||
| COOK 2 | 0 | 01/19/2002 | REFUELING OUTAGE - DEFUELED | ||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 95 | 100% ELECTRICAL CAPABILITY | |||
| DRESDEN 3 | 100 | ||||
| DUANE ARNOLD 1 | 93 | HOLDING POWER AT THIS LEVEL DUE TO A FEEDWATER REGULATING VALVE ISSUE | * | ||
| FERMI 2 | 100 | * | |||
| KEWAUNEE 1 | 100 | ||||
| LASALLE 1 | 0 | 01/10/2002 | REFUELING OUTAGE | ||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 100 | ||||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 50 | HOLDING POWER AT THIS LEVEL TO CLEAN WATERBOXES | * | ||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 0 | 02/01/2002 | REFUELING OUTAGE | * | |
| QUAD CITIES 1 | 0 | 01/09/2002 | MAINTENANCE OUTAGE | ||
| QUAD CITIES 2 | 95 | COASTDOWN TO REFUELING OUTAGE | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 96 | HOLDING POWER AT THIS LEVEL TO PERFORM HEATER DRAIN PUMP MODIFICATIONS | * | ||
| CALLAWAY 1 | 0 | 01/31/2002 | MAINTENANCE OUTAGE | * | |
| COLUMBIA GENERATING | 100 | * | |||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 98 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 99 | ||||
| PALO VERDE 2 | 98 | ||||
| PALO VERDE 3 | 99 | ||||
| RIVER BEND 1 | 100 | ||||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 100 | ||||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 100 | ||||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026