The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 16, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100   .    
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 0 12/15/2001 MANUAL REACTOR SCRAM FROM 60% POWER DUE TO AN UNIDENTIFIED LEAK RATE EXCEEDING 5 GPM (Refer to event #38574) * 1
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 92   INCREASING POWER AFTER DECREASING TO 55% POWER TO PERFORM CONDENSER THERMAL BACKWASHING AND MAINTENANCE ACTIVITIES *  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 61   HOLDING POWER AT THIS LEVEL TO PERFORM POWER SUPPRESSION TESTING *  

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 65   HOLDING POWER AT THIS LEVEL TO PERFORM FLUX SUPPRESSION TESTING *  
BROWNS FERRY 3 90   INCREASING POWER AFTER DECREASING TO 85% POWER TO PERFORM CONTROL ROD ADJUSTMENTS AND MAINTENANCE *  
BRUNSWICK 1 100     *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 0 12/07/2001 MAINTENANCE OUTAGE    
CRYSTAL RIVER 3 46   HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER PUMP MAINTENANCE *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE    
HATCH 1 100        
HATCH 2 100     *  
MCGUIRE 1 100        
MCGUIRE 2 100     *  
NORTH ANNA 1 100        
NORTH ANNA 2 100     *  
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100     *  
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 11/25/2001 REFUELING OUTAGE    
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 95   100% ELECTRICAL CAPABILITY    
BYRON 1 82   DECREASING TO APPROXIMATELY 79% POWER TO PERFORM TURBINE THROTTLE AND GOVERNOR VALVE TESTING *  
BYRON 2 100        
CLINTON 1 0 12/15/2001 MAINTENANCE OUTAGE - EVALUATING POST-MAINTENANCE TESTING FOLLOWING THE REPAIR OF THE 'A' RECIRCULATION FLOW CONTROL VALVE - PREPARING TO ENTER MODE 2 *  
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 64   HOLDING POWER AT THIS LEVEL TO PERFORM RECIRCULATION FLOW RESPONSE TESTING AND CONTROL ROD SWAPS *  
DRESDEN 3 0 12/10/2001 MAINTENANCE OUTAGE    
DUANE ARNOLD 1 93   HOLDING POWER AT MAXIMUM PER INTERIM POWER UPRATE    
FERMI 2 95   INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM CONTROL ROD PATTERN ADJUSTMENTS *  
KEWAUNEE 1 95   HOLDING POWER AT THIS LEVEL UNTIL THE PLANT PROCESS COMPUTER IS RESTORED    
LASALLE 1 98   COASTDOWN TO REFUELING OUTAGE *  
LASALLE 2 87   DECREASING TO APPROXIMATELY 84% POWER TO PERFORM TURBINE CONTROL VALVE TESTING *  
MONTICELLO 1 40   HOLDING POWER AT THIS LEVEL TO PERFORM CONTROL ROD DRIVE SCRAM TESTING AFTER EXITING A REFUELING OUTAGE *  
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 0 12/15/2001 AUTOMATIC REACTOR SCRAM FROM 100% POWER, EMERGENCY CORE COOLING SYSTEM ACTUATIONS, AND BALANCE-OF-PLANT ISOLATIONS BECAUSE THE REACTOR RECIRCULATION PUMPS DOWN SHIFTED TO SLOW SPEED FOR UNKNOWN REASONS (Refer to event #38575) * 1
POINT BEACH 1 98        
POINT BEACH 2 98        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 35   HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSER WORK *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 11/03/2001 REFUELING OUTAGE    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 98        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.