The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 6, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 41   DECREASING TO 20% POWER TO PERFORM A DRYWELL INSPECTION *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 92   INCREASING TO 95% POWER TO MONITOR THE 'A' CIRCULATING PUMP FOR POSSIBLE VIBRATION *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 2   MAINTENANCE OUTAGE - STARTUP IN PROGRESS *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 5   REFUELING OUTAGE - HOLDING POWER AT THIS LEVEL *  
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 0 12/05/2001 MAINTENANCE OUTAGE *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 95   LOAD FOLLOWING *  
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - REFUELED    
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 0 10/28/2001 MAINTENANCE OUTAGE    
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 11/10/2001 REFUELING OUTAGE - REFUELED    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 11/25/2001 REFUELING OUTAGE - PREPARING TO COMMENCE A FUEL SHUFFLE *  
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 10/14/2001 REFUELING OUTAGE - CRITICAL - COMPLETING LOW POWER PHYSICS TESTING *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 96   100% ELECTRICAL EQUIVALENT    
BYRON 1 99        
BYRON 2 100        
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 99     *  
DRESDEN 3 98   SLOWLY INCREASING POWER AFTER EXITING A MAINTENANCE OUTAGE *  
DUANE ARNOLD 1 93   HOLDING POWER AT MAXIMUM PER INTERIM POWER UPRATE    
FERMI 2 0 12/06/2001 MANUAL REACTOR SCRAM FROM 100% POWER DUE TO A LOSS OF STATOR WATER COOLING (Refer to event #38542) * 1
KEWAUNEE 1 28   PERFORMING A CHEMISTRY HOLD AFTER EXITING A REFUELING/MAINTENANCE OUTAGE    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 11/03/2001 REFUELING OUTAGE - REFUELED    
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 98        
POINT BEACH 2 98        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 12/03/2001 MAINTENANCE OUTAGE - APPROACHING CRITICALITY *  
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 11/03/2001 REFUELING OUTAGE - IN BETWEEN FUEL MOVES - MOVING CONTROL ROD BLADES    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 98     *  
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours