The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 1, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100     *  
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 90   PERFORMING MAINTENANCE ON A CIRC WATER PUMP *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 35   PLANNED LOAD DROP TO 20% POWER FOR A PLANNED ENTRANCE INTO THE DRYWELL TO REPAIR A NITROGEN LEAK. *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 0 10/08/2001 REFUELING OUTAGE    
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 18   REDUCING REACTOR POWER TO TAKE THE MAIN TURBINE OFF LINE FOR REPAIRS. *  
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - DEFUELED    
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 0 10/28/2001 MAINTENANCE OUTAGE    
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 11/10/2001 REFUELING OUTAGE    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 11/25/2001 REFUELING OUTAGE - EXITING MIDLOOP OPS *  
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 10/14/2001 REFUELING OUTAGE    
SURRY 2 32   INCREASING POWER *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 96   100% EQUIVALENT ELECTRICAL    
BYRON 1 99     *  
BYRON 2 100        
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 46   REDUCING POWER DOWN TO 25% TO PERFORM WORK ON MG SET FOR RECIRC PUMP "3B". *  
DUANE ARNOLD 1 93   HOLDING POWER AT MAXIMUM PER INTERIM POWER UPRATE *  
FERMI 2 60   HOLDING POWER LEVEL FOR NEUTRON MONITORING EQUIPMENT ADJUSTMENTS *  
KEWAUNEE 1 0 09/23/2001 REFUELING OUTAGE    
LASALLE 1 98   COASTDOWN TO REFUELING OUTAGE    
LASALLE 2 90   SURVEILLANCE TESTING *  
MONTICELLO 1 0 11/03/2001 REFUELING OUTAGE    
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100     *  
COMANCHE PEAK 1 98     *  
COMANCHE PEAK 2 100        
COOPER 1 0 11/03/2001 REFUELING OUTAGE    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 99     *  
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 98        
PALO VERDE 3 72   REDUCING POWER DOWN TO 12% FOR PLANNED MAIN TURBINE WORK. *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.