The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 10, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 85   INCREASING POWER AFTER RECOVERING FROM A REACTOR TRIP DURING A UNIT STARTUP ON 11/08/01 (Refer to event #38486) *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 81   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 99        
MILLSTONE 3 92   INCREASING POWER AFTER DECREASING TO 30% TO REPAIR A LETDOWN ISOLATION VALVE *  
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 99   POWER LIMITED BY LINE STABILITY DUE TO A HOPE CREEK BREAKER OUTAGE *  
SALEM 2 99   POWER LIMITED BY LINE STABILITY DUE TO A HOPE CREEK BREAKER OUTAGE *  
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 0 10/08/2001 REFUELING OUTAGE *  
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 10/05/2001 REFUELING OUTAGE - HEAD TENSIONING IN PROGRESS *  
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - DEFUELED    
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 94   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
NORTH ANNA 1 100        
NORTH ANNA 2 0 10/28/2001 MAINTENANCE OUTAGE    
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 11/10/2001 REFUELING OUTAGE *  
ROBINSON 2 100        
SAINT LUCIE 1 0 11/08/2001 MAINTENANCE OUTAGE    
SAINT LUCIE 2 100        
SEQUOYAH 1 0 10/21/2001 REFUELING OUTAGE - DEFUELED    
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 10/14/2001 REFUELING OUTAGE - REFUELED *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 11/06/2001 MAINTENANCE OUTAGE    
BYRON 1 99   100% OF RATED ELECTRICAL CAPABILITY    
BYRON 2 100        
CLINTON 1 97   HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A RECIRCULATION FLOW CONTROL VALVE ISSUE *  
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 97   HOLDING POWER AT THIS LEVEL TO PERFORM MODERATOR TEMPERATURE COEFFICIENT TESTING *  
DRESDEN 2 70   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
DRESDEN 3 100        
DUANE ARNOLD 1 61   HOLDING POWER AT THIS LEVEL TO PERFORM POWER UPRATE TESTING *  
FERMI 2 0 10/27/2001 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
KEWAUNEE 1 0 09/23/2001 REFUELING OUTAGE - DEFUELED    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 11/03/2001 REFUELING OUTAGE - PERFORMING IN VESSEL VISUAL INSPECTIONS *  
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 98   INCREASING POWER AFTER DECREASING TO 93% TO PERFORM TURBINE VALVE TESTING *  
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 11/03/2001 REFUELING OUTAGE - NO CORE ALTERATIONS IN PROGRESS *  
DIABLO CANYON 1 30   DECREASING POWER TO ENTER A MAINTENANCE OUTAGE FOR THE MAIN GENERATOR *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98     *  
PALO VERDE 2 75   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 98        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021