The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 3, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100     *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 10/09/2001 REFUELING OUTAGE - STARTUP IN PROGRESS *  
INDIAN POINT 2 0 10/26/2001 MAINTENANCE OUTAGE    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 74   INCREASING POWER AFTER DECREASING TO 60% TO PERFORM A ROD PATTERN ADJUSTMENT *  
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 0 10/08/2001 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *  
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 10/05/2001 REFUELING OUTAGE - HEAD DETENSIONED - PREPARING FOR HEAD LIFT *  
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - DEFUELED    
HATCH 1 100        
HATCH 2 100     *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 0 10/28/2001 MAINTENANCE OUTAGE - HEAD DETENSIONED - PREPARING TO LIFT HEAD FOR INSPECTION *  
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 0 10/21/2001 REFUELING OUTAGE - DEFUELED    
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 10/14/2001 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *  
SURRY 2 100        
TURKEY POINT 3 94   HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A TURBINE VALVE PROBLEM *  
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 84   HOLDING POWER AT THIS LEVEL DUE TO TURBINE GENERATOR VIBRATION    
BYRON 1 99   100% OF RATED ELECTRICAL CAPABILITY    
BYRON 2 100        
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 0 10/20/2001 REFUELING OUTAGE - PREPARING FOR HYDRO *  
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 0 10/27/2001 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
KEWAUNEE 1 0 09/23/2001 REFUELING OUTAGE - DEFUELED    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 7   PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE *  
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 6   INCREASING POWER - PREPARING TO PLACE THE UNIT ON LINE AFTER RECOVERING FROM A MANUAL REACTOR TRIP DUE TO A STEAM LEAK ON 10/31/01 (Refer to event #38448) *  
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 18   HOLDING POWER AT THIS LEVEL TO WAIT FOR AS-TILT VALUES TO COME BACK INTO SPEC AFTER RECOVERING FROM AN AUTOMATIC REACTOR TRIP FROM 22% POWER DURING CEA TROUBLESHOOTING ON 11/01/01 (Refer to event #38457) *  
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 17   PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 96   HOLDING POWER AT THIS LEVEL TO PERFORM WEEKLY STEAM GENERATOR BLOWDOWNS *  
PALO VERDE 2 0 10/10/2001 MAINTENANCE OUTAGE    
PALO VERDE 3 0 09/28/2001 REFUELING OUTAGE *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.