Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | * | |||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 100 | ||||
HOPE CREEK 1 | 0 | 10/09/2001 | REFUELING OUTAGE - STARTUP IN PROGRESS | * | |
INDIAN POINT 2 | 0 | 10/26/2001 | MAINTENANCE OUTAGE | ||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 100 | ||||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 74 | INCREASING POWER AFTER DECREASING TO 60% TO PERFORM A ROD PATTERN ADJUSTMENT | * | ||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 100 | ||||
SEABROOK 1 | 100 | ||||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 0 | 10/08/2001 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | * | |
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 0 | 10/05/2001 | REFUELING OUTAGE - HEAD DETENSIONED - PREPARING FOR HEAD LIFT | * | |
FARLEY 2 | 100 | ||||
HARRIS 1 | 0 | 09/21/2001 | REFUELING OUTAGE - DEFUELED | ||
HATCH 1 | 100 | ||||
HATCH 2 | 100 | * | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 0 | 10/28/2001 | MAINTENANCE OUTAGE - HEAD DETENSIONED - PREPARING TO LIFT HEAD FOR INSPECTION | * | |
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 0 | 10/21/2001 | REFUELING OUTAGE - DEFUELED | ||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 100 | ||||
SURRY 1 | 0 | 10/14/2001 | REFUELING OUTAGE - FUEL RELOAD IN PROGRESS | * | |
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 94 | HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A TURBINE VALVE PROBLEM | * | ||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 84 | HOLDING POWER AT THIS LEVEL DUE TO TURBINE GENERATOR VIBRATION | |||
BYRON 1 | 99 | 100% OF RATED ELECTRICAL CAPABILITY | |||
BYRON 2 | 100 | ||||
CLINTON 1 | 100 | ||||
COOK 1 | 100 | ||||
COOK 2 | 100 | ||||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 0 | 10/20/2001 | REFUELING OUTAGE - PREPARING FOR HYDRO | * | |
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 0 | 10/27/2001 | REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | * | |
KEWAUNEE 1 | 0 | 09/23/2001 | REFUELING OUTAGE - DEFUELED | ||
LASALLE 1 | 100 | ||||
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 7 | PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE | * | ||
PALISADES 1 | 0 | 06/20/2001 | MAINTENANCE OUTAGE | ||
PERRY 1 | 100 | ||||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 6 | INCREASING POWER - PREPARING TO PLACE THE UNIT ON LINE AFTER RECOVERING FROM A MANUAL REACTOR TRIP DUE TO A STEAM LEAK ON 10/31/01 (Refer to event #38448) | * | ||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 18 | HOLDING POWER AT THIS LEVEL TO WAIT FOR AS-TILT VALUES TO COME BACK INTO SPEC AFTER RECOVERING FROM AN AUTOMATIC REACTOR TRIP FROM 22% POWER DURING CEA TROUBLESHOOTING ON 11/01/01 (Refer to event #38457) | * | ||
CALLAWAY 1 | 100 | ||||
COLUMBIA GENERATING | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 17 | PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE | * | ||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 96 | HOLDING POWER AT THIS LEVEL TO PERFORM WEEKLY STEAM GENERATOR BLOWDOWNS | * | ||
PALO VERDE 2 | 0 | 10/10/2001 | MAINTENANCE OUTAGE | ||
PALO VERDE 3 | 0 | 09/28/2001 | REFUELING OUTAGE | * | |
RIVER BEND 1 | 100 | ||||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | ||||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 100 |