Power Reactor Status Report for October 4, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 08/31/2001 REFUELING OUTAGE    
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 80   REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES AFFECTING THE MAIN TRANSFORMER    
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 0 09/14/2001 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
PILGRIM 1 100        
SALEM 1 0 09/24/2001 RCS HEATUP IN PROGRESS *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 89   COASTDOWN TO REFUELING OUTAGE    
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 0 09/15/2001 REFUELING OUTAGE - DEFUELED    
CRYSTAL RIVER 3 0 09/29/2001 REFUELING OUTAGE    
FARLEY 1 92   COASTDOWN TO REFUELING OUTAGE *  
FARLEY 2 100        
HARRIS 1 0 09/21/2001 REFUELING OUTAGE - DEFUELED    
HATCH 1 100        
HATCH 2 0 09/15/2001 REFUELING OUTAGE    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 0 09/08/2001 REFUELING OUTAGE    
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 85   COASTDOWN TO REFUELING OUTAGE *  
SURRY 2 100        
TURKEY POINT 3 0 09/29/2001 REFUELING OUTAGE *  
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 0 09/21/2001 REFUELING OUTAGE *  
BRAIDWOOD 2 96   100% OF RATED ELECTRICAL CAPABILITY    
BYRON 1 71   LOAD FOLLOWING *  
BYRON 2 100        
CLINTON 1 100        
COOK 1 100        
COOK 2 0 08/30/2001 MAINTENANCE OUTAGE *  
DAVIS BESSE 1 100        
DRESDEN 2 91   COASTDOWN TO REFUELING OUTAGE *  
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 0 09/23/2001 REFUELING OUTAGE    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 0 06/20/2001 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 99        
PALO VERDE 3 0 09/28/2001 REFUELING OUTAGE    
RIVER BEND 1 0 09/23/2001 REFUELING OUTAGE    
SAN ONOFRE 2 98        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 10/02/2001 REFUELING OUTAGE *  
SOUTH TEXAS 2 0 10/03/2001 UNIT SHUTDOWN IN PROGRESS TO REPAIR FEEDWATER ISOLATION VALVE LEAK *  
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021