Power Reactor Status Report for May 22, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 98 | INCREASING POWER | * | ||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 100 | * | |||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 0 | 04/27/2001 | REFUELING OUTAGE | * | |
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 100 | ||||
| MILLSTONE 2 | 100 | ||||
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | * | |||
| OYSTER CREEK 1 | 100 | * | |||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 47 | HOLDING FOR TESTING | * | ||
| SALEM 1 | 98 | INCREASING POWER | * | ||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 95 | HOLDING POWER DUE TO LOSS OF A CIRCULATING WATER PUMP | |||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 75 | OBSERVING "A" MAIN TRANSFORMER GASES. | |||
| VERMONT YANKEE 1 | 80 | INCREASING POWER | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 100 | ||||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | * | |||
| BRUNSWICK 2 | 90 | INCREASING POWER | * | ||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 0 | 05/18/2001 | COOLING DOWN FOR MAINTENANCE WORK | * | |
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 80 | LOWERED POWER FOR PLANNED MAINTENANCE | * | ||
| OCONEE 1 | 18 | MAIN TURBINE OFF LINE. REPAIRING SEAL OIL PROBLEM ON THE MAIN GENERATOR. | * | ||
| OCONEE 2 | 0 | 04/25/2001 | REFUELING OUTAGE | * | |
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | * | |||
| SUMMER 1 | 100 | * | |||
| SURRY 1 | 100 | ||||
| SURRY 2 | 5 | PREPARING TO GO ON LINE. | * | ||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 97 | RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE | |||
| BRAIDWOOD 2 | 88 | HOLDING POWER BECAUSE OF LOAD DISPATCHER REQUEST. | * | ||
| BYRON 1 | 86 | DECREASING REACTOR POWER PER LOAD DISPATCHER REQUEST. | * | ||
| BYRON 2 | 98 | RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE | * | ||
| CLINTON 1 | 100 | ||||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 81 | REDUCED POWER PER LOAD DISPATCHER REQUEST. | * | ||
| DRESDEN 3 | 100 | ||||
| DUANE ARNOLD 1 | 0 | 04/12/2001 | REFUELING OUTAGE | ||
| FERMI 2 | 100 | ||||
| KEWAUNEE 1 | 96 | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | |||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 0 | 05/21/2001 | MAINTENANCE OUTAGE | * | |
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 0 | 05/09/2001 | MAINTENANCE OUTAGE | ||
| QUAD CITIES 1 | 83 | REDUCED POWER PER LOAD DISPATCHER REQUEST. | * | ||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 30 | HOLDING FOR STEAM GENERATOR CHEMISTRY | * | ||
| COLUMBIA GENERATING | 0 | 05/19/2001 | REFUELING OUTAGE | * | |
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 0 | 04/28/2001 | REFUELING OUTAGE | ||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 99 | * | |||
| PALO VERDE 2 | 99 | ||||
| PALO VERDE 3 | 19 | HOLDING POWER FOR INSTRUMENTATION CHECKS. | * | ||
| RIVER BEND 1 | 100 | ||||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 02/03/2001 | MAINTENANCE OUTAGE | ||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 90 | TESTING | |||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021