The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 19, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 05/18/2001 SCHEDULED OUTAGE *  
CALVERT CLIFFS 2 98     *  
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 82   INCREASING POWER *  
INDIAN POINT 2 100        
INDIAN POINT 3 0 04/27/2001 REFUELING OUTAGE    
LIMERICK 1 67   PLANNED LOAD REDUCTION *  
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 1   STARTUP *  
OYSTER CREEK 1 100     *  
PEACH BOTTOM 2 48   WATERBOX CLEANING IN PROGRESS *  
PEACH BOTTOM 3 100        
PILGRIM 1 26   INCREASING POWER *  
SALEM 1 25   INCREASING POWER *  
SALEM 2 100        
SEABROOK 1 95   HOLDING POWER DUE TO LOSS OF A CIRCULATING WATER PUMP    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 60   PERFORMING WATERBOX INSPECTION. *  
THREE MILE ISLAND 1 75   OBSERVING "A" MAIN TRANSFORMER GASES. *  
VERMONT YANKEE 1 0 04/27/2001 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 57   TESTING IN PROGRESS *  
BRUNSWICK 2 100        
CATAWBA 1 92   INCREASING POWER AFTER TESTING *  
CATAWBA 2 100        
CRYSTAL RIVER 3 0 05/18/2001 SCHEDULED MAINTENANCE WORK ON THE FEEDWATER SYSTEM. *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 92   BEARING TROUBLE WITH ONE CONDENSATE BOOSTER PUMP    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 90   INCREASING POWER *  
OCONEE 2 0 04/25/2001 REFUELING OUTAGE    
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 88   MAIN FEED PUMP WORK *  
SURRY 1 100        
SURRY 2 0 05/11/2001 MAINTENANCE OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 97   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
BRAIDWOOD 2 100        
BYRON 1 98   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
BYRON 2 99   RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE    
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 0 04/12/2001 REFUELING OUTAGE    
FERMI 2 100        
KEWAUNEE 1 97   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES *  
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 88   INCREASING POWER *  
PERRY 1 73   HOLDING POWER FOR CIRC WATER PUMP PROBLEM *  
POINT BEACH 1 100        
POINT BEACH 2 60   WATERBOX CLEANING *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 05/09/2001 MAINTENANCE OUTAGE    
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 04/06/2001 REFUELING OUTAGE    
COLUMBIA GENERATING 13   COASTDOWN TO REFUELING OUTAGE *  
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 04/28/2001 REFUELING OUTAGE    
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 99     *  
PALO VERDE 3 45   REDUCING REACTOR POWER FOR MAIN TURBINE WORK *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 02/03/2001 MAINTENANCE OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 90   TESTING *  
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021