The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 7, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/16/2001 REFUELING OUTAGE *  
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 60   REDUCED POWER FOR FEEDWATER SYSTEM MAINTENANCE *  
INDIAN POINT 3 0 04/27/2001 REFUELING OUTAGE    
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 97     *  
MILLSTONE 3 100        
NINE MILE POINT 1 21   HOLD FOR TURBINE TESTING *  
NINE MILE POINT 2 0 05/05/2001 SHUTDOWN FOR PLANNED MAINTENANCE    
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 0 04/21/2001 REFUELING OUTAGE    
SALEM 1 0 04/06/2001 REFUELING OUTAGE    
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 50   REDUCED POWER FOR MAINTENANCE *  
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 52   HOLDING DUE TO TRANSFORMER PROBLEM *  
VERMONT YANKEE 1 0 04/27/2001 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 0 02/24/2001 REFUELING OUTAGE    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 04/25/2001 REFUELING OUTAGE    
OCONEE 3 100        
ROBINSON 2 0 04/06/2001 REFUELING OUTAGE    
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 60   INCREASING POWER *  
SURRY 2 100        
TURKEY POINT 3 100     *  
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 80   INCREASING POWER *  
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 0 04/12/2001 REFUELING OUTAGE    
FERMI 2 100        
KEWAUNEE 1 97   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES *  
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100     *  
PALISADES 1 0 03/30/2001 REFUELING OUTAGE    
PERRY 1 90   INCREASING POWER *  
POINT BEACH 1 0 04/06/2001 REFUELING OUTAGE *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100     *  
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 04/06/2001 REFUELING OUTAGE    
COLUMBIA GENERATING 87   COASTDOWN TO REFUELING OUTAGE *  
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 04/28/2001 REFUELING OUTAGE    
FT CALHOUN 1 100     *  
GRAND GULF 1 100     *  
PALO VERDE 1 0 03/31/2001 REFUELING OUTAGE    
PALO VERDE 2 99        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 98     *  
SAN ONOFRE 3 0 02/03/2001 MAINTENANCE OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021