The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for April 13, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 40 | REDUCED POWER FOR MAINTENANCE | * | ||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 0 | 03/16/2001 | REFUELING OUTAGE | ||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 100 | ||||
| HOPE CREEK 1 | 80 | REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCE | |||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 0 | 04/04/2001 | REFUELING OUTAGE | ||
| MILLSTONE 2 | 97 | * | |||
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 0 | 03/18/2001 | REFUELING OUTAGE | ||
| NINE MILE POINT 2 | 95 | * | |||
| OYSTER CREEK 1 | 98 | * | |||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 0 | 04/06/2001 | REFUELING OUTAGE | ||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 0 | 03/09/2001 | REFUELING OUTAGE | ||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 0 | 03/18/2001 | REFUELING OUTAGE | * | |
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 100 | ||||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 0 | 02/24/2001 | REFUELING OUTAGE - DEFUELED | ||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 0 | 03/09/2001 | REFUELING OUTAGE | ||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 85 | INCREASING POWER | * | ||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 0 | 02/16/2001 | MAINTENANCE OUTAGE | ||
| ROBINSON 2 | 0 | 04/06/2001 | REFUELING OUTAGE | ||
| SAINT LUCIE 1 | 0 | 04/02/2001 | REFUELING OUTAGE | ||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 100 | ||||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 0 | 04/07/2001 | REFUELING OUTAGE | ||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | ||||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 0 | 04/06/2001 | REFUELING OUTAGE | * | |
| CLINTON 1 | 100 | ||||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 100 | ||||
| DRESDEN 3 | 100 | ||||
| DUANE ARNOLD 1 | 0 | 04/12/2001 | REFUELING OUTAGE | * | |
| FERMI 2 | 100 | ||||
| KEWAUNEE 1 | 96 | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | |||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 80 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | * | ||
| PALISADES 1 | 0 | 03/30/2001 | REFUELING OUTAGE | ||
| PERRY 1 | 68 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | * | ||
| POINT BEACH 1 | 0 | 04/06/2001 | REFUELING OUTAGE | ||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 100 | ||||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 0 | 04/06/2001 | REFUELING OUTAGE | ||
| COLUMBIA GENERATING | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| COMANCHE PEAK 1 | 0 | 03/24/2001 | REFUELING OUTAGE - REFUELED | ||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 0 | 03/15/2001 | REFUELING OUTAGE | ||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 0 | 03/31/2001 | REFUELING OUTAGE - DEFUELED | ||
| PALO VERDE 2 | 99 | ||||
| PALO VERDE 3 | 99 | ||||
| RIVER BEND 1 | 67 | TROUBLESHOOTING CAUSE OF THE "A" RECIRC PUMP TRIP | |||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 02/03/2001 | MAINTENANCE OUTAGE | ||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 99 | ||||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026