Power Reactor Status Report for March 5, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 98   COASTDOWN TO REFUELING OUTAGE    
FITZPATRICK 1 100        
GINNA 1 47   HOLDING POWER AT THIS LEVEL TO PERFORM CIRCULATING WATER PUMP WORK *  
HOPE CREEK 1 100     *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 93   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 100        
MILLSTONE 3 0 02/03/2001 REFUELING OUTAGE    
NINE MILE POINT 1 100        
NINE MILE POINT 2 70   INCREASING POWER AFTER EXITING A PLANNED MAINTENANCE OUTAGE *  
OYSTER CREEK 1 100     *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 93   COASTDOWN TO REFUELING OUTAGE *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 0 02/23/2001 REFUELING OUTAGE - INITIAL FUEL SHUFFLE COMPLETE    
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 0 02/24/2001 REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS *  
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 90   COASTDOWN TO REFUELING OUTAGE *  
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 72   COASTDOWN TO REFUELING OUTAGE    
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 02/16/2001 MAINTENANCE OUTAGE    
ROBINSON 2 91   COASTDOWN TO REFUELING OUTAGE    
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 48   HOLDING POWER AT THIS LEVEL TO PERFORM FLUX MAPPING AFTER EXITING A REFUELING OUTAGE AND TECH SPEC REQUIRED SHUTDOWN FROM 12% DUE TO FAILURE OF TWO FEEDWATER FLOW CHANNELS TO RESPOND DURING A PLANT STARTUP (Refer to event #37804) *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100     *  
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100     *  
CLINTON 1 100     *  
COOK 1 30   HOLDING POWER AT THIS LEVEL TO ISOLATE A STEAM LEAK ON A BLEED STEAM LINE *  
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100     *  
DUANE ARNOLD 1 100        
FERMI 2 100     *  
KEWAUNEE 1 96   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 02/25/2001 MAINTENANCE OUTAGE TO PERFORM INSERVICE INSPECTIONS    
PALISADES 1 100        
PERRY 1 0 02/16/2001 REFUELING OUTAGE - FUEL RELOAD AND SHUFFLE IN PROGRESS    
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 99   HOLDING POWER AT THIS LEVEL FOR XENON STABILIZATION AFTER DECREASING TO 45% TO REPLACE A REACTOR COOLANT SYSTEM FLOW TRANSMITTER *  
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/03/2001 MID-CYCLE MAINTENANCE OUTAGE TO EXCHANGE A FUEL LEAKER BUNDLE - AUTOMATIC SCRAM ON LOW REACTOR WATER LEVEL DURING THE PLANNED SHUTDOWN FOLLOWED BY A MANUAL SCRAM IN ANTICIPATION OF LOW REACTOR WATER LEVEL (Refer to event #37805) * 2
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 30   HOLDING POWER AT THIS LEVEL AS PART OF A COASTDOWN TO REFUELING OUTAGE AND TO MINIMIZE ACTIVITY IN COOLANT PRIOR TO OUTAGE    
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 99   MAXIMUM POWER - LIMITED BY T(cold) DUE TO INSTALLATION OF A NEW ULTRASONIC FLOW METER *  
PALO VERDE 3 100        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 02/03/2001 MAINTENANCE OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 75   HOLDING POWER AT THIS LEVEL FOR XENON STABILIZATION AND TO CONTINUE COASTDOWN TO REFUELING OUTAGE AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 95% POWER DUE TO LOSS OF AN OPERATING CIRCULATING WATER PUMP (Refer to event #37794) *  
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021