Power Reactor Status Report for March 4, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | ||||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 48 | HOLDING POWER AT THIS LEVEL TO PERFORM CIRCULATING WATER PUMP WORK | * | ||
| HOPE CREEK 1 | 87 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | ||
| INDIAN POINT 2 | 100 | ||||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
| MILLSTONE 2 | 100 | ||||
| MILLSTONE 3 | 0 | 02/03/2001 | REFUELING OUTAGE | ||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 31 | HOLDING POWER AT THIS LEVEL TO INVESTIGATE THE CAUSE OF A RECIRCULATION PUMP TRIP AFTER EXITING A PLANNED MAINTENANCE OUTAGE | * | ||
| OYSTER CREEK 1 | 96 | INCREASING POWER AFTER DECREASING TO 84% POWER TO PERFORM A POWER TO FLOW SWAP | * | ||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 100 | ||||
| SALEM 1 | 100 | ||||
| SALEM 2 | 100 | ||||
| SEABROOK 1 | 100 | ||||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
| BROWNS FERRY 3 | 100 | * | |||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 0 | 02/23/2001 | REFUELING OUTAGE - INITIAL FUEL SHUFFLE COMPLETE | ||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 0 | 02/24/2001 | REFUELING OUTAGE - PREPARING TO LIFT UPPER INTERNALS | * | |
| HARRIS 1 | 100 | ||||
| HATCH 1 | 100 | ||||
| HATCH 2 | 100 | ||||
| MCGUIRE 1 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 72 | COASTDOWN TO REFUELING OUTAGE | |||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 0 | 02/16/2001 | MAINTENANCE OUTAGE | ||
| ROBINSON 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | . | |||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 30 | HOLDING POWER AT THIS LEVEL TO RESTORE A FEEDWATER PUMP AFTER EXITING A REFUELING OUTAGE AND TECH SPEC REQUIRED SHUTDOWN FROM 12% DUE TO FAILURE OF TWO FEEDWATER FLOW CHANNELS TO RESPOND DURING A PLANT STARTUP (Refer to event #37804) | * | ||
| SURRY 1 | 100 | ||||
| SURRY 2 | 100 | ||||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 98 | DECREASING POWER TO 95% TO PERFORM A FEEDWATER PUMP SWAP | * | ||
| BRAIDWOOD 2 | 100 | ||||
| BYRON 1 | 100 | ||||
| BYRON 2 | 80 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING | * | ||
| CLINTON 1 | 75 | HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE | * | ||
| COOK 1 | 100 | ||||
| COOK 2 | 100 | ||||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 100 | ||||
| DRESDEN 3 | 70 | HOLDING POWER AT THIS LEVEL TO PERFORM DEEP/SHALLOW ROD SWAPS | * | ||
| DUANE ARNOLD 1 | 100 | ||||
| FERMI 2 | 70 | DECREASING POWER TO 60% TO REPLACE AIR-OPERATED VALVE CONTROLS ON A NORMAL DRAIN LINE FROM THE 6 SOUTH HEATER TO THE 5 SOUTH HEATER - PROBLEM CAUSED FEEDWATER HEATER OSCILLATIONS | * | ||
| KEWAUNEE 1 | 96 | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | * | ||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 0 | 02/25/2001 | MAINTENANCE OUTAGE TO PERFORM INSERVICE INSPECTIONS | ||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 0 | 02/16/2001 | REFUELING OUTAGE - FUEL RELOAD AND SHUFFLE IN PROGRESS | ||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 100 | ||||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 57 | INCREASING POWER AT A RATE OF 3% PER HOUR AFTER DECREASING TO 45% TO REPLACE A REACTOR COOLANT SYSTEM FLOW TRANSMITTER | * | ||
| COLUMBIA GENERATING | 100 | ||||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 0 | 03/03/2001 | MID-CYCLE MAINTENANCE OUTAGE TO EXCHANGE A FUEL LEAKER BUNDLE - AUTOMATIC SCRAM ON LOW REACTOR WATER LEVEL DURING THE PLANNED SHUTDOWN FOLLOWED BY A MANUAL SCRAM IN ANTICIPATION OF LOW REACTOR WATER LEVEL (Refer to event #37805) | * | 2 |
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 30 | HOLDING POWER AT THIS LEVEL AS PART OF A COASTDOWN TO REFUELING OUTAGE AND TO MINIMIZE ACTIVITY IN COOLANT PRIOR TO OUTAGE | * | ||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 100 | ||||
| PALO VERDE 2 | 99 | ||||
| PALO VERDE 3 | 100 | ||||
| RIVER BEND 1 | 100 | ||||
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 02/03/2001 | MAINTENANCE OUTAGE | ||
| SOUTH TEXAS 1 | 100 | ||||
| SOUTH TEXAS 2 | 83 | INCREASING POWER AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 95% POWER DUE TO LOSS OF AN OPERATING CIRCULATING WATER PUMP (Refer to event #37794) - PLAN TO PERFORM NUCLEAR INSTRUMENTATION CALIBRATIONS AT 90% POWER AND CONTINUE COASTDOWN AT 94% POWER | * | ||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 100 |