Power Reactor Status Report for January 14, 2001
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | ||||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 100 | ||||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 30 | MANAGEMENT HOLD AFTER EXITING A MAINTENANCE/REFUELING OUTAGE | * | ||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
MILLSTONE 2 | 100 | * | |||
MILLSTONE 3 | 88 | COASTDOWN TO REFUELING OUTAGE | * | ||
NINE MILE POINT 1 | 85 | INCREASING POWER AFTER DECREASING TO 72% POWER TO PERFORM A ROD SEQUENCE EXCHANGE | * | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 98 | HOLDING POWER AT THIS LEVEL DUE TO A REHEATER DRAIN TANK LEVEL COLUMN PROBLEM - REPAIR PLANNING IN PROGRESS | * | ||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 85 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING AND PLANNED MAINTENANCE ON THE 23 CONDENSATE PUMP | * | ||
SEABROOK 1 | 0 | 10/20/2000 | REFUELING OUTAGE - 'B' DIESEL GENERATOR REPAIRS IN PROGRESS | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 100 | ||||
HATCH 2 | 100 | ||||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 16 | EXITING REFUELING OUTAGE - PLAN TO PERFORM BALANCE SHOT ON ROTOR DUE TO HIGH VIBRATION ON TURBINE GENERATOR SHAFT BEARING #9 | * | ||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | . | |||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 0 | 10/07/2000 | REFUELING OUTAGE - DEFUELED - 'A' HOT LEG REPAIRS IN PROGRESS | ||
SURRY 1 | 100 | ||||
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 100 | ||||
BYRON 1 | 80 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE THROTTLE AND GOVERNOR VALVE TESTING | * | ||
BYRON 2 | 100 | ||||
CLINTON 1 | 100 | ||||
COOK 1 | 100 | * | |||
COOK 2 | 100 | ||||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 95 | INCREASING POWER AFTER DECREASING TO 88% POWER TO PERFORM A ROD SHUFFLE | * | ||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 74 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE WORK AFTER DECREASING POWER TO 30 OR 35% TO REPLACE RECIRCULATION PUMP MG SET BRUSHES WHILE IN SINGLE LOOP OPERATION | * | ||
FERMI 2 | 100 | ||||
KEWAUNEE 1 | 96 | MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 95 | HOLDING POWER AT THIS LEVEL TO PERFORM POWER UPRATE TESTING | * | ||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 94 | INCREASING POWER AFTER DECREASING TO 86% POWER TO PERFORM CONTROL ROD TESTING - PLAN TO CONTINUE COASTDOWN TO REFUELING OUTAGE AT APPROXIMATELY 97% POWER | * | ||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 83 | COASTDOWN TO REFUELING OUTAGE | * | ||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 11 | HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE DUE TO SECONDARY SYSTEM CONTAMINATION (SULFATE AND CHLORIDE) INGRESS AND CONCURRENT HIGH TURBINE GENERATOR VIBRATION - UNIT TAKEN OFF LINE ON 01/13/01 | * | ||
CALLAWAY 1 | 100 | ||||
COLUMBIA GENERATING | 100 | LICENSE AMENDMENT ISSUED FOR NAME CHANGE FROM WNP-2 ON 01/08/2001 | * | ||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 100 | ||||
PALO VERDE 3 | 100 | * | |||
RIVER BEND 1 | 100 | ||||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 01/02/2001 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | * | |||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021