The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 17, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 50   HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER PUMP OVERSPEED TESTING AFTER EXITING A REFUELING OUTAGE *  
GINNA 1 100        
HOPE CREEK 1 99     *  
INDIAN POINT 2 0 02/15/2000 DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 0 10/13/2000 EXITING REFUELING OUTAGE - REACTOR STARTUP IN PROGRESS *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 64   HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER PUMP MAINTENANCE AFTER EXITING A REFUELING OUTAGE *  
SEABROOK 1 0 10/20/2000 REFUELING OUTAGE - DEFUELED    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 0 10/14/2000 EXITING REFUELING OUTAGE    
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 0 11/16/2000 PREPARING FOR STARTUP AFTER RECOVERING FROM AN AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO HIGH STEAM GENERATOR WATER LEVEL (Refer to event #37527) *  
HARRIS 1 100        
HATCH 1 100        
HATCH 2 75   HOLDING POWER AT THIS LEVEL TO PERFORM A ROD SEQUENCE EXCHANGE AND TIMING - PLAN TO DECREASE TO 50% POWER TO PERFORM CONDENSER BAY VALVE WORK *  
MCGUIRE 1 100        
MCGUIRE 2 26   UNIT ON LINE - INCREASING POWER AFTER RECOVERING FROM A TURBINE RUNBACK FROM 100% POWER AND SUBSEQUENT MANUAL REACTOR TRIP FROM ABOUT 23% POWER ON 11/15/00 (Refer to event #37524) *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 100        
SEQUOYAH 2 48   HOLDING POWER AT THIS LEVEL TO ENTER INCORE FLUX DATA INTO THE POWER RANGE MONITORS AFTER EXITING A REFUELING OUTAGE *  
SUMMER 1 0 10/07/2000 REFUELING OUTAGE - DEFUELED - REMOVING A 3-FOOT SECTION OF THE HOT LEG TO ELIMINATE/REPAIR A CRACK *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 0 11/09/2000 REFUELING OUTAGE - FIRST OF TWO FUEL SHUFFLES COMPLETE    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 98   ADMINISTRATIVE POWER LIMIT DUE TO POWER UPRATE    
POINT BEACH 1 100        
POINT BEACH 2 0 10/13/2000 REFUELING OUTAGE - REFUELED    
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 88   HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT THE VOLTAGE REGULATOR FOR THE RECIRCULATION PUMP "B" MG SET *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 09/15/2000 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS    
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 12   EXITING REFUELING OUTAGE - PERFORMING MAIN GENERATOR VOLTAGE REGULATOR MAINTENANCE *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 99     *  
PALO VERDE 3 99     *  
RIVER BEND 1 100        
SAN ONOFRE 2 20   UNIT ON LINE - INCREASING POWER AT A RATE OF 3% PER HOUR AFTER EXITING A REFUELING OUTAGE *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 0 10/14/2000 EXITING REFUELING OUTAGE - STARTUP IN PROGRESS    
WNP-2 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021