Power Reactor Status Report for November 12, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 0 10/07/2000 REFUELING OUTAGE - MAKING PREPARATIONS FOR STARTUP    
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 0 02/15/2000 DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100     *  
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 0 10/13/2000 REFUELING OUTAGE    
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 0 10/05/2000 DILUTING TO GO CRITICAL *  
SEABROOK 1 0 10/20/2000 REFUELING OUTAGE - DEFUELED    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100     *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 0 10/14/2000 EXITING REFUELING OUTAGE    
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 93   INCREASING REACTOR POWER TO 100% AFTER COMPLETING A ROD PATTERN ADJUSTMENT. *  
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 0 10/06/2000 EXITING MAINTENANCE OUTAGE *  
SEQUOYAH 2 0 10/22/2000 EXITING REFUELING OUTAGE *  
SUMMER 1 0 10/07/2000 REFUELING OUTAGE - DEFUELED    
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 24   INCREASING REACTOR POWER *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 0 11/09/2000 REFUELING OUTAGE    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 98        
POINT BEACH 1 100        
POINT BEACH 2 0 10/13/2000 REFUELING OUTAGE - DEFUELED    
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100     *  
QUAD CITIES 2 32   HOLDING POWER LEVEL TO CORRECT TURBINE CONTROL VALVE # 3 OSCILLATION AND REPAIR UNIT 2 EDG CONTROL SWITCH. *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 09/15/2000 REFUELING OUTAGE - DEFUELED    
CALLAWAY 1 100     *  
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 0 10/08/2000 PERFORMING PHYSICS TESTING    
DIABLO CANYON 2 100        
FT CALHOUN 1 99     *  
GRAND GULF 1 100        
PALO VERDE 1 100     *  
PALO VERDE 2 99        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 0 10/07/2000 REFUELING OUTAGE    
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 0 10/14/2000 EXITING REFUELING OUTAGE    
WNP-2 100     *  
WOLF CREEK 1 100     *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021