Power Reactor Status Report for October 16, 2000
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | ||||
BEAVER VALLEY 2 | 0 | 09/22/2000 | EXITING REFUELING OUTAGE | * | |
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 0 | 10/07/2000 | REFUELING OUTAGE - PHASE 1 OF FUEL SHUFFLE COMPLETE - CONTROL ROD DRIVE CHANGEOUTS IN PROGRESS | * | |
GINNA 1 | 0 | 09/18/2000 | EXITING REFUELING OUTAGE - PREPARING TO ENTER MODE 3 | * | |
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 0 | 02/15/2000 | DEFUELED | ||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 100 | ||||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 0 | 10/13/2000 | ENTERING REFUELING OUTAGE | ||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 10/05/2000 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | * | |
SEABROOK 1 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | UNUSUAL EVENT DECLARED AND TERMINATED ON 10/14/00 DUE TO A FIRE IN THE PROTECTED AREA LASTING LONGER THAN 10 MINUTES (REFER TO EVENT #37430) | |||
CATAWBA 1 | 0 | 10/14/2000 | ENTERING REFUELING OUTAGE | ||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 09/29/2000 | REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | ||
HATCH 2 | 100 | ||||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 87 | HOLDING POWER AT THIS LEVEL TO PERFORM T(ave) TESTING AFTER EXITING A REFUELING OUTAGE | * | ||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | DECREASED TO ABOUT 26% POWER ON 10/14/00 TO ENTER CONTAINMENT AND MANUALLY ISOLATE A SMALL IDENTIFIED LEAK (0.1 GPM) POSSIBLY ON A SAMPLE LINE VALVE IN A LOOP ROOM - UNIT REMAINED ON LINE | * | ||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | . | |||
SEQUOYAH 1 | 0 | 10/06/2000 | FORCED MAINTENANCE OUTAGE | ||
SEQUOYAH 2 | 79 | COASTDOWN TO REFUELING OUTAGE | * | ||
SUMMER 1 | 0 | 10/07/2000 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | * | |
SURRY 1 | 100 | ||||
SURRY 2 | 0 | 09/30/2000 | REFUELING OUTAGE - DEFUELED | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 0 | 09/24/2000 | REFUELING OUTAGE - REFUELED | ||
VOGTLE 1 | 0 | 09/17/2000 | EXITING REFUELING OUTAGE | * | |
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 100 | ||||
BYRON 1 | 100 | * | |||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 10/14/2000 | ENTERING REFUELING OUTAGE - HEAD DETENSIONING IN PROGRESS | * | |
COOK 1 | 0 | 09/08/1997 | REFUELING OUTAGE - DEFUELED | ||
COOK 2 | 100 | ||||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 100 | ||||
KEWAUNEE 1 | 96 | MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 97 | HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS | |||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 98 | ADMINISTRATIVE POWER LIMIT DUE TO POWER UPRATE | * | ||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 0 | 10/13/2000 | ENTERING REFUELING OUTAGE | * | |
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 0 | 10/14/2000 | ENTERING REFUELING OUTAGE - PREPARING FOR CORE ALTERATIONS | * | |
QUAD CITIES 2 | 95 | HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL VALVE PROBLEM | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 0 | 09/15/2000 | REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED | ||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 0 | 09/30/2000 | REFUELING OUTAGE - DEFUELED | ||
COOPER 1 | 0 | 10/14/2000 | AUTOMATIC REACTOR SCRAM FROM 100% POWER DUE TO A MAIN GENERATOR TRIP FOR UNKNOWN REASONS (REFER TO EVENT #37429) | ||
DIABLO CANYON 1 | 0 | 10/08/2000 | ENTERING REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | * | |
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 0 | 10/14/2000 | FORCED MAINTENANCE OUTAGE DUE TO INDICATION OF REACTOR COOLANT PUMP SEAL DEGRADATION (NOT LEAKAGE) - PLAN TO REPLACE SEAL | * | |
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 0 | 10/03/2000 | REFUELING OUTAGE - DEFUELED | ||
PALO VERDE 3 | 99 | HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS | |||
RIVER BEND 1 | 97 | INCREASING POWER AT A RATE OF 1% PER DAY - POWER UPRATE IN PROGRESS | * | ||
SAN ONOFRE 2 | 0 | 10/07/2000 | ENTERING REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | * | |
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | ||||
WATERFORD 3 | 0 | 10/14/2000 | ENTERING REFUELING OUTAGE | * | |
WNP-2 | 100 | ||||
WOLF CREEK 1 | 0 | 09/29/2000 | REFUELING OUTAGE - DEFUELED |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021