The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 13, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 0 09/22/2000 REFUELING OUTAGE - REFUELED *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 0 10/07/2000 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS    
GINNA 1 0 09/18/2000 REFUELING OUTAGE - LOOPS NOT FILLED    
HOPE CREEK 1 100        
INDIAN POINT 2 0 02/15/2000 DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100     *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 78   COASTDOWN TO REFUELING OUTAGE *  
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 0 10/05/2000 ENTERING REFUELING OUTAGE - REACTOR VESSEL HEAD REMOVED *  
SEABROOK 1 92   COASTDOWN TO REFUELING OUTAGE *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 88   COASTDOWN TO REFUELING OUTAGE    
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 89   HOLDING POWER AT THIS LEVEL TO PERFORM COOLING TOWER REPAIRS *  
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 0 09/29/2000 REFUELING OUTAGE - INITIAL (PARTIAL) CORE OFFLOAD COMPLETE    
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 16   EXITING REFUELING OUTAGE - HOLDING POWER AT THIS LEVEL WITH THE UNIT ON LINE TO PERFORM A 2-HOUR SOAK FOLLOWED BY A TURBINE OVERSPEED TRIP TEST *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 0 10/06/2000 FORCED MAINTENANCE OUTAGE    
SEQUOYAH 2 81   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 0 10/07/2000 REFUELING OUTAGE - HEAD LIFT COMPLETE - PREPARING FOR FUEL OFFLOAD *  
SURRY 1 100        
SURRY 2 0 09/30/2000 REFUELING OUTAGE - DEFUELED    
TURKEY POINT 3 100        
TURKEY POINT 4 0 09/24/2000 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS    
VOGTLE 1 0 09/17/2000 REFUELING OUTAGE - REACTOR COOLANT SYSTEM FILL AND VENT IN PROGRESS    
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 22   EXITING REFUELING OUTAGE - HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE DUE TO TURBINE PROBLEMS *  
BYRON 2 100        
CLINTON 1 98   COASTDOWN TO REFUELING OUTAGE *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 93   HOLDING POWER AT THIS LEVEL TO WORK ON A HEATER DRAIN VALVE    
LASALLE 2 97   HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 95   HOLDING POWER AT THIS LEVEL DUE TO MSR #2A AND #2B BEING ISOLATED    
POINT BEACH 1 90   HOLDING POWER AT THIS LEVEL FOR PLANNED 345-kV LINE MAINTENANCE    
POINT BEACH 2 98   COASTDOWN TO REFUELING OUTAGE *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 80   COASTDOWN TO REFUELING OUTAGE    
QUAD CITIES 2 95   HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL VALVE PROBLEM *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 09/15/2000 REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED    
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 09/30/2000 REFUELING OUTAGE - DEFUELED    
COOPER 1 100        
DIABLO CANYON 1 0 10/08/2000 ENTERING REFUELING OUTAGE    
DIABLO CANYON 2 100        
FT CALHOUN 1 75   DECREASING POWER DUE TO INDICATION OF REACTOR COOLANT PUMP SEAL DEGRADATION (NOT LEAKAGE) - PLAN TO GO TO COLD SHUTDOWN TO REPLACE SEAL PRIOR TO SEAL FAILURE *  
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 0 10/03/2000 REFUELING OUTAGE - DEFUELED *  
PALO VERDE 3 99   HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS *  
RIVER BEND 1 95   POWER UP RATE IN PROGRESS    
SAN ONOFRE 2 0 10/07/2000 ENTERING REFUELING OUTAGE - HEAD LIFT IN PROGRESS *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 100        
WOLF CREEK 1 0 09/29/2000 REFUELING OUTAGE - DEFUELED    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.