The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 7, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 0 09/22/2000 REFUELING OUTAGE - DEFUELED *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 4   SHUTTING DOWN TO REFUELING OUTAGE *  
GINNA 1 0 09/18/2000 EXITING REFUELING OUTAGE    
HOPE CREEK 1 100        
INDIAN POINT 2 0 02/15/2000 DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 97     *  
MILLSTONE 3 100        
NINE MILE POINT 1 0 09/24/2000 WORKING ON ELECTROMATIC RELIEF VALVE    
NINE MILE POINT 2 100        
OYSTER CREEK 1 80   COASTDOWN TO REFUELING OUTAGE    
PEACH BOTTOM 2 40   INCREASING POWER *  
PEACH BOTTOM 3 100        
PILGRIM 1 100     *  
SALEM 1 100        
SALEM 2 0 10/05/2000 ENTERING REFUELING OUTAGE R11 *  
SEABROOK 1 97   COASTDOWN TO REFUELING OUTAGE *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 55   REDUCED POWER FOR PLANNED MAINTENANCE *  
BRUNSWICK 2 100        
CATAWBA 1 89   COASTDOWN TO REFUELING OUTAGE *  
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 79   REDUCED REACTOR POWER DUE TO "1C" COOLING TOWER BEING TAKEN OUT OF SERVICE FOR REPAIRS. *  
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 0 09/29/2000 REFUELING OUTAGE    
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 0 09/01/2000 EXITING REFUELING OUTAGE    
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 80   REDUCED POWER FOR REPAIRS TO 'A' HEATER DRAIN PUMP *  
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 0 10/06/2000 INVESTIGATING PROBLEM WITH VIBRATION OF RCP #4 *  
SEQUOYAH 2 86   COASTDOWN TO REFUELING OUTAGE    
SUMMER 1 1   ENTERING REFUELING OUTAGE #12 *  
SURRY 1 100        
SURRY 2 0 09/30/2000 REFUELING OUTAGE - DEFUELED *  
TURKEY POINT 3 100        
TURKEY POINT 4 0 09/24/2000 REFUELING OUTAGE - DEFUELED *  
VOGTLE 1 0 09/17/2000 REFUELING OUTAGE - REFUELING *  
VOGTLE 2 100        
WATTS BAR 1 13   ROLLING MAIN TURBINE *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 0 09/22/2000 EXITING REFUELING OUTAGE *  
BYRON 2 100        
CLINTON 1 100   COASTDOWN TO REFUELING OUTAGE    
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 97     *  
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 96   COASTDOWN TO REFUELING OUTAGE *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 97        
POINT BEACH 1 90   REDUCED POWER FOR PLANNED MAINTENANCE *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 82   COASTDOWN TO REFUELING OUTAGE    
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 09/15/2000 REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED    
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 09/30/2000 REFUELING OUTAGE    
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 0 10/03/2000 ENTERING REFUELING OUTAGE    
PALO VERDE 3 100     *  
RIVER BEND 1 100        
SAN ONOFRE 2 89   COASTDOWN TO REFUELING OUTAGE    
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 85   REDUCED POWER FOR MAINTENANCE *  
WOLF CREEK 1 0 09/29/2000 REFUELING OUTAGE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021