The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 24, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 93   HOLDING POWER AT THIS LEVEL TO PERFORM WATERBOX CLEANING *  
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 50   HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER HEATER TESTING AFTER EXITING A MAINTENANCE OUTAGE *  
INDIAN POINT 2 0 02/15/2000 REFUELING OUTAGE    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 95   HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSATE DEMINERALIZER REBUILDS *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 30   PREPARING TO ENTER A PLANNED MAINTENANCE OUTAGE TO PERFORM TRANSFORMER COOLER CLEANING *  
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 63   HOLDING POWER AT THIS LEVEL TO REPAIR A STEAM LEAK IN THE OUTBOARD MSIV ROOM *  
PILGRIM 1 100        
SALEM 1 90   HOLDING POWER AT THIS LEVEL TO PERFORM MAIN FEEDWATER HEATER TUBE LEAK REPAIRS *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 55   HOLDING POWER AT THIS LEVEL TO PERFORM SURVEILLANCE TESTING AND REACTOR FEEDWATER PUMP MINIMUM FLOW VALVE CONTROL CIRCUIT MAINTENANCE *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100     *  
CRYSTAL RIVER 3 100        
FARLEY 1 80   HOLDING POWER AT THIS LEVEL TO PERFORM COOLING TOWER REPAIRS *  
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100     *  
ROBINSON 2 85   HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSATE RECIRCULATION BYPASS VALVE REPAIRS *  
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 3   EXITING REFUELING/MAINTENANCE OUTAGE *  
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 0 06/23/2000 REACTOR SCRAM FROM 100% POWER AS A RESULT OF A TURBINE TRIP FOR UNKNOWN REASONS (REFER TO EVENT #37110) * 1
FERMI 2 61   HOLDING POWER AT THIS LEVEL TO PERFORM NORTH STEAM TUNNEL COOLER MAINTENANCE *  
KEWAUNEE 1 94   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 25   UNIT ON LINE AFTER EXITING A FORCED MAINTENANCE OUTAGE - HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE AND SCRAM TIME TESTING *  
MONTICELLO 1 100        
PALISADES 1 96   INCREASING POWER AFTER REDUCING TO 59% TO PERFORM #1A MAIN FEEDWATER PUMP REPAIRS - SEAL REPLACEMENT COMPLETE *  
PERRY 1 98        
POINT BEACH 1 59   HOLDING POWER AT THIS LEVEL TO PERFORM WATERBOX CLEANING *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 99     *  
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 60   HOLDING POWER AT THIS LEVEL TO LOOK FOR A FUEL PIN LEAK *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100     *  
PALO VERDE 2 100        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 75   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE, TURBINE FRONT STANDARD, AND SCRAM TIME TESTING *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021