The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 27, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 64   DECREASING TO 60% POWER FOR FEEDWATER PUMP MAINTENANCE AND LOAD FOLLOWING *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 61   DECREASING TO 50% POWER FOR OFFSITE POWER/TRANSMISSION WORK *  
HOPE CREEK 1 14   HOLDING POWER AT THIS LEVEL FOR MAIN TRANSFORMER PHASE 'C' REPLACEMENT *  
INDIAN POINT 2 0 02/15/2000 REFUELING OUTAGE - DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 81   HOLDING POWER AT THIS LEVEL FOR FEEDWATER AND CIRCULATING WATER PUMP MAINTENANCE *  
LIMERICK 2 100        
MILLSTONE 2 0 04/21/2000 EXITING A REFUELING OUTAGE *  
MILLSTONE 3 100        
NINE MILE POINT 1 95   HOLDING POWER AT THIS LEVEL FOR CONDENSATE DEMINERALIZER WORK *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 42   INCREASING POWER TO 50% FOR THERMAL BACKWASH AFTER REDUCING TO 25% FOR RECIRCULATION PUMP MAINTENANCE *  
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100     *  
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 30   PERFORMING A CHEMISTRY HOLD AFTER EXITING A REFUELING OUTAGE *  
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 0 05/25/2000 EXITING A FORCED OUTAGE - STARTUP IN PROGRESS *  
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 10   FORCED MAINTENANCE OUTAGE - HOLDING POWER FOR MAINTENANCE (TURBINE GENERATOR ALTER-X BEARING VIBRATION) *  
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100     *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 82   HOLDING POWER AT THIS LEVEL FOR FEEDWATER HEATER MAINTENANCE *  
DRESDEN 3 96   HOLDING POWER AT THIS LEVEL TO RECOVER A ROD *  
DUANE ARNOLD 1 100        
FERMI 2 97     *  
KEWAUNEE 1 0 04/21/2000 EXITING REFUELING OUTAGE    
LASALLE 1 100        
LASALLE 2 98     *  
MONTICELLO 1 30   HOLDING POWER AT THIS LEVEL FOR CONDENSER WATERBOX CLEANING *  
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 04/28/2000 REFUELING OUTAGE *  
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 EXITING REFUELING OUTAGE - STARTUP IN PROGRESS *  
DIABLO CANYON 1 30   HOLDING POWER AT THIS LEVEL TO PERFORM A BORON SOAK AFTER EXITING A MAINTENANCE OUTAGE *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 80   POWER LIMITED BECAUSE A CONDENSATE BOOSTER PUMP IS OUT OF SERVICE *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021