Power Reactor Status Report for May 15, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 04/21/2000 REFUELING OUTAGE    
INDIAN POINT 2 0 02/15/2000 REFUELING OUTAGE - DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 0 04/21/2000 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 90   INCREASING POWER *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 46   INCREASING POWER *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/04/2000 REFUELING OUTAGE . *  
FARLEY 2 100        
HARRIS 1 50   INCREASING POWER *  
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/12/2000 REFUELING OUTAGE    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/17/2000 REFUELING OUTAGE *  
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 0 03/31/2000 COMPLETED MAINTENANCE ON REACTOR COOLANT FLOW TRANSMITTER, RC-1BB. IN THE PROCESS OF HEATING THE PLANT UP TO HOT SHUTDOWN CONDITION. *  
DRESDEN 2 85   REDUCED REACTOR POWER FOR FEEDWATER TUNING AND FEEDWATER HEATER REPAIRS. *  
DRESDEN 3 100     *  
DUANE ARNOLD 1 95   HOLDING POWER LEVEL FOR THERMAL LIMITS AFTER COMPLETING A ROD SEQUENCE EXCHANGE. *  
FERMI 2 0 04/01/2000 REFUELING OUTAGE    
KEWAUNEE 1 0 04/21/2000 REFUELING OUTAGE    
LASALLE 1 95   POWER UPRATE IN PROGRESS *  
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 90   REDUCED REACTOR POWER AS A PRECAUTIONARY MEASURE BECAUSE THE UNIT LOSS ONE OF ITS OFFSITE LINES, (LINE # 111). *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 04/28/2000 REFUELING OUTAGE    
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 REFUELING OUTAGE    
DIABLO CANYON 1 0 05/14/2000 UNUSUAL EVENT SEE EVENT # 37001. * 1
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 23   INCREASING REACTOR POWER LEVEL. *  
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 55   INCREASING REACTOR POWER LEVEL TO 61%. *  
WOLF CREEK 1 100        