Power Reactor Status Report for May 5, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 0 04/21/2000 REFUELING OUTAGE - DEFUELED    
INDIAN POINT 2 0 02/15/2000 MAINTENANCE/REFUELING OUTAGE - DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 98   SLOWLY INCREASING REACTOR POWER *  
LIMERICK 2 100        
MILLSTONE 2 0 04/21/2000 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 0 04/30/2000 MAINTENANCE OUTAGE *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 1   STARTUP TESTING IN PROGRESS *  
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 35   HOLDING POWER LEVEL FOR SCRAM TIME TESTING *  
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/04/2000 REFUELING OUTAGE - DEFUELED    
FARLEY 2 100        
HARRIS 1 0 04/15/2000 REFUELING OUTAGE    
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/12/2000 REFUELING OUTAGE - DEFUELED    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/17/2000 REFUELING OUTAGE - DEFUELED    
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 04/16/2000 REFUELING OUTAGE    
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 0 03/31/2000 REFUELING OUTAGE    
DRESDEN 2 100        
DRESDEN 3 0 05/04/2000 MANUALLY SCRAMMED THE PLANT FROM 44% POWER. SEE EVENT # 36975. * 1
DUANE ARNOLD 1 100        
FERMI 2 0 04/01/2000 REFUELING OUTAGE    
KEWAUNEE 1 0 04/21/2000 REFUELING OUTAGE    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 0 05/04/2000 PLANNED MAINTENANCE OUTAGE *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 04/28/2000 REFUELING OUTAGE    
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 REFUELING OUTAGE    
DIABLO CANYON 1 100     *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 96   CONTROL VALVE TESTING IN PROGRESS *  
PALO VERDE 2 100        
PALO VERDE 3 70   HOLDING POWER LEVEL FOR ENGINEERING CALCULATIONS *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/01/2000 REFUELING OUTAGE    
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 61   LOAD FOLLOWING *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.