The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 30, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 40   REDUCED POWER FOR SECONDARY PLANT MAINTENANCE ON HEATER DRAIN PUMP (REPLACE PACKING) *  
CALVERT CLIFFS 1 97   HOLDING FOR ROD TESTING    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 98   STEAM LEAK ISOLATED - HOLDING DUE TO REHEAT SYSTEM BEING OFF LINE    
GINNA 1 100        
HOPE CREEK 1 0 04/21/2000 REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS    
INDIAN POINT 2 0 02/15/2000 MAINTENANCE/REFUELING OUTAGE - DEFUELED    
INDIAN POINT 3 100        
LIMERICK 1 89   INCREASING POWER TO 100% *  
LIMERICK 2 100        
MILLSTONE 2 0 04/21/2000 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 75   REDUCING POWER IN PREPARATION FOR UNIT SHUTDOWN *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/18/2000 REFUELING OUTAGE    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 0 04/15/2000 REFUELING OUTAGE - VESSEL REASSEMBLY IN PROGRESS    
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 38   INCREASING POWER TO 100% *  
CRYSTAL RIVER 3 100     *  
FARLEY 1 0 03/04/2000 REFUELING OUTAGE - DEFUELED    
FARLEY 2 100        
HARRIS 1 0 04/15/2000 REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS *  
HATCH 1 100        
HATCH 2 99     *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/12/2000 REFUELING OUTAGE - DEFUELED    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/17/2000 REFUELING OUTAGE - DEFUELED    
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 0 04/16/2000 REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 80   REDUCED POWER FOR SURVEILLANCE TESTING *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 0 03/31/2000 REFUELING OUTAGE *  
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 0 04/01/2000 REFUELING OUTAGE - SHUTDOWN COOLING OUTAGE IN PROGRESS    
KEWAUNEE 1 0 04/21/2000 REFUELING OUTAGE    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 0 04/28/2000 REFUELING OUTAGE *  
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 REFUELING OUTAGE    
DIABLO CANYON 1 92   REDUCING POWER TO 50% FOR SECONDARY PLANT MAINTENANCE (SALTWATER TUNNEL CLEANING) *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 0 03/31/2000 EXITING REFUELING OUTAGE *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/01/2000 REFUELING OUTAGE - REPLACING STEAM GENERATORS - CORE RELOAD COMPLETED - RV HEAD INSTALLATION IN PROGRESS *  
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WNP-2 61   LOAD FOLLOWING    
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.